|
|
|
Astrometric & Photometric
Monitoring
|
|
- SS Cyg, U Gem (dwarf nova)
- U And, W And (mira variables)
- BL Lac (blazar)
- RX And, Z And, KR Aur, SY Cnc, GK
Per (variables)
RZ LMi attempt (failed due to cloud)
|
|
- |
Evening session (1.8
hrs), operated under automated control |
- |
Ambient Temperature
4 deg C, |
- |
CCD operation -27 degC (at
100% average cooling).
(unintended CCD Temp setting - plan had been -25 degC) |
- |
main objective of the
session was to acquire images of key selected stars for ongoing photometric and astrometric
analysis.
|
- |
|
|