David's Astronomy Pages
Notes - Session 641 (2018-12-16)

   
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (2),  Minor Issues (7),  Continuous Improvement (0)
 
 
Bullet Images from 2018-12-16  >>
 
2018-12-17
Bullet Dome Port Switching
 
 

Session Aims & Highlights (2018-12-16)

Main aims

  1. Software. Test operation of Observatory Control Program (AstroMain)  following several recent code changes and corrections.
  2. Focusing. Test corrected routines for autofocusing the TS 80mm secondary scope with Pegasus Universal Stepper Motor/ZWO camera images
  3. Targets. Acquire images of a range of targets (comets, variable stars, nearby stars and deep sky objects)
  4. Stability. Check overall stability of the Observatory System (hardware & software) 

Equipment & Software

Highlights

Lowlights

Summary Plots & Logs

Observing Result (2018-12-16, S641)
Image
Time   Activity
17:18 Operations Started
17:22   Observatory Manager set to auto
17:25   Observing Plan built
17:25   Shutter Opened / Dome Equilbration started
17:30   Job queue started
17:33   Software Crash (Unhandled Exception - No further details
18:04   Job queue resumed
18:49   Foc1 Focusing (TCF-S)
21:16   Job stopped / Observatory Manager returned to Manual
21:17   Cam2 Testing (TS-80).
21:22   Foc2 Focusing (TS-80).
21:27.   Foc2 Focusing (TS-80)
21:43.   Foc2 Focusing (TS-80)
21:55   Observatory Manager set to auto
21:56   Job queue restarted
22:01   Software Crash  (Camera/AnalyseStarsInImage issue)
22:19   Foc1 Focusing (TCF-S)
22:29.    Dome Parked, Telescope Parked. 
22:30.   Operations Ended.
   
Night Sky Summary Plot - 2018-12-16
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Shutter/Telescope active from ~ 22:00 to ~ 01:30
Image

Back to Top


Operational Issues (2018-12-16, S641)

[ Prev | Next ]

Critical Issues

Major Issues

Minor issues

Continuous Improvement - None

[ Prev | Next ]

Back to Top


2018-12-17


Dome Port Switching

Log Monitoring shows the following responses to unexpected changes in Dome's COM Port

AstroMain    AstroGuard      
Time  Report Log Time  Report Log  
17:06 ASCOM Dome (COM9):  Started  17:05   ASCOM Dome (COM9):  Started   
          
21:18  "Dome has changed from COM9 to COM14" 21:18   "Dome has changed from COM9 to COM14"
  An attempt will be made to restart the dome connection    An attempt will be made to restart the dome connection   
  POTH.Dome  Stopped   POTH.Dome  Stopped  
  POTH.Dome (COM14):  Started (>> Pulsar Dome)   POTH.Dome (COM14):  Started (>> Pulsar Dome)  
          
23:55 Dome Port lost   23:55 No message from AstroGuard at this time   
  An attempt will be made to restart the dome connection       
  POTH.Dome  Stopped      
   POTH.Dome (COM14):  Started (>> Pulsar Dome)      
          
~ 01:15 Dome Connection noticed to not be working from POTH Hub
Dome Disconnected, then reconnected from POTH.Hub
 
     

Back to Top