Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
 
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (0),  Minor Issues (0),  Continuous Improvement (0)
 
Bullet Images from 2019-10-17  >>
 
2019-10-18
Bullet Flooded Observatory Floor
 

Session Aims & Highlights (2019-10-17)

Main aims

  1. Check AstroMain Program: Confirm that there were no issues following recent changes and improvement to the program
  2. Targets:  Acquire image data for a number of variable stars, nearby stars and comets
  3. Software & Systems  - Check ongoing stability of observatory software, drivers and equipment

 
Equipment & Software

Highlights

Lowlights

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Slew/Centering Performance
Image
  
Dome Slewing Performance
Image
  
Sky Conditions (Locate Frames)
Image
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
   
Pre-Session Weather Forecast (AstroWeather 1.7.8)
Forecast showed patchy cloud up to 00:00 and then cloud thickeneing until total cloud cover at 04:00
In the event therre was a moderately clear interval between 23:00 and 00:45.
Operations suspended at 23:42 and remained that way until the morning  
Image   
  
Session Event Log
Time     Event Detail
23:31:17 Session Created Live Session Created (2019-10-17 S00711, ImageSaveNum: 711001)
23:31:41   Scope Switched On Scope Power has been switched on via UPB Powerbox.
23:33:35   Obs.Manager Started Obs.Manager started
23:33:37   Obs.Overseer Started Obs.Overseer started
23:33:42   Services Started Observatory Services started
23:34:53 Observatory (Auto) Observatory placed in Fully-Automated Mode
23:34:56 Session Pending Session pending (2019-10-17)
23:34:58 Session Initiating Session initiating (2019-10-17)
23:35:00   Plan Requested Observing Plan requested from AstroPlan (1.12.8)
23:35:47   Plan Loaded Observing Plan loaded to queue (2019-10-17 V1 BEST PLAN, Plan ID: 393)
23:36:00   Camera1 Connected SBIG Camera Connected (set point -15°C)
23:36:02   Telescope Connected Telescope Connected (TheSky6)
23:36:18 Session Equilibration Session ready for dome & camera equilibration
23:37:03   Shutter Opened Shutter opened (opening time 45s)
23:37:06   Equilibration Started Dome Equilibration started
23:41:03   Equilibration Ended Dome Equilibration ended (4.0 mins total)
23:41:05 Session Running Session running
23:41:07   Queue Started Observing Queue started (36 targets selected)
23:42:07       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:44:03       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
23:44:05     Target Started (1/36) Target started (1/36, GCVS Z And)
23:45:51       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:48:00       Focusing Completed Foc1 AutoFocus Completed (Profile No 2)
23:51:03     Target Completed Target partially completed (1/36, GCVS Z And)
23:51:05     Target Started (2/36) Target started (2/36, GSC 1224:29)
23:59:24     Target Completed Target completed (2/36, GSC 1224:29)
23:59:26     Target Started (3/36) Target started (3/36, GCVS CM Tau)
00:01:30       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:04:03       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
00:18:28     Target Completed Target completed (3/36, GCVS CM Tau)
00:18:31     Target Started (4/36) Target started (4/36, GCVS SS Cyg)
00:21:15       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:23:13       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
00:27:03     Target Completed Target completed (4/36, GCVS SS Cyg)
00:29:39     Target Started (5/36) Target started (5/36, GCVS HH And)
00:32:04       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:34:09       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
00:36:10     Target Completed Target completed (5/36, GCVS HH And)
00:37:04     Target Started (6/36) Target started (6/36, GCVS RX And)
00:39:27       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:41:53       Focusing Completed Foc1 AutoFocus Completed (Profile No 6)
00:44:35     Target Completed Target completed (6/36, GCVS RX And)
00:44:37     Target Started (7/36) Target started (7/36, GCVS DY Per)
00:47:41       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:49:53       Focusing Completed Foc1 AutoFocus Completed (Profile No 7)
00:54:47     Target Completed Target completed (7/36, GCVS DY Per)
00:54:49     Target Started (8/36) Target started (8/36, GCVS S Cyg)
00:57:56       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:00:23       Focusing Completed Foc1 AutoFocus Completed (Profile No 8)
01:02:41 Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Shutter)
01:02:43   HardSuspend Called Hard Suspend is called due to Critical Conditions (cloud)
01:02:45     Target Aborted (8/36) Target aborted (8/36, GCVS S Cyg) due to cloud
01:02:47   Queue Paused Queue pausing for HardSuspend
01:02:49 Session Suspended Session suspended
01:03:36   Shutter Closed Shutter closed (closing time 47s)
01:03:39     Queue Resumed Queue resumed after HardSuspend (52s)
01:06:11     Target Cancelled Target cancelled (8/36, GCVS S Cyg) due to cloud
01:10:17 Session Resuming Session resuming
01:11:02   Shutter Opened Shutter opened (opening time 45s)
01:11:04 Session Running Session running
01:11:06   Queue Resumed Observing Queue resumed
01:11:08     Target Started (9/36) Target started (9/36, 61 Cyg)
01:13:11       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:15:06       Focusing Completed Foc1 AutoFocus Completed (Profile No 9)
01:16:23     Target Completed Target completed (9/36, 61 Cyg)
01:16:26     Target Started (10/36) Target started (10/36, GCVS CY AQR)
01:21:01       Focusing Failed Foc1 Focusing Failed - unable to find a star (TCF-S)
01:22:03 Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Shutter)
01:22:05   HardSuspend Called Hard Suspend is called due to Critical Conditions (cloud)
01:22:07     Target Aborted (10/36) Target aborted (10/36, GCVS CY AQR) due to cloud
01:22:09   Queue Paused Queue pausing for HardSuspend
01:22:10 Session Suspended Session suspended
01:22:58   Shutter Closed Shutter closed (closing time 48s)
01:23:01     Queue Resumed Queue resumed after HardSuspend (55s)
01:24:28 User Intervention User request to close and finish session
01:24:31   Queue Aborted Job Queue aborted
01:24:34 Session Closing Session closing
01:24:38   Shutter Closed Shutter already closed (closed at 01:22, closing time 48s)
01:25:38   Dome Parked Dome parked (parking time 60s)
01:26:22   Telescope Parked Telescope parked (parking time 41s)
01:27:04 Session Housekeeping Housekeeping Started (Cleanup FITS, Create Fits Summary, Transfer Files)
01:27:20 Session Finished Session Finished
   

Back to Top


Operational Issues (2019-10-17, S711)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Continuous Improvement

[ Prev | Next ]

Back to Top


2019-10-18


Flooded Observatory Floor (2019-10-18)

There was a very heavy rain storm on the morning of 2019-10-18. It was the sort of deluge that overflows the gutters and lifts the drain covers (not literally, but the water was forcing its way out of the drain cover sides and 'boiling' 5cm into the air !). During a visit to the observatory the following day, it was noticed that there was a distinct feeling and sound of water squelching under the rubber floor tiles, and looking down there was water coming up through the gaps between tiles when pressure was applied.

Pulling back the floor tiles and investigating revealed a huge puddle on water on the floor of the observatory, both on top of and under the plastic membrane. 

Pictures of the Puddle on Observatory Floor following deluge on 2019-10-18

Image    Image

 The rubber floor tiles were lifted and removed and towels used to soak up the large puddle of water. 

After the puddle was cleared an investigation began into how the water got into the observatory: 

Investigating how the water got into the observatory (2019-10-19 & 2019-10-20)

Image    Image
  
Image    Image
  
Image    Image
  

First Repair Attempt
An emergency repair was made a few days later in which the sealent was replaced along all the sections of observatory based with obvious weakness. However this remedial repair was unsuccessful and water continued to seep under the walls from multiple points.

It was concluded that the repair had failed and during a second remedial repair on 2019-11-18, it was evident that the sealent in the first repair attempt has failed to bond to the concrete, during to dampness in the concrete and the seep of built up water still lingering under the wall.

Sealent along observatory base was eventually fixed by a second repair fix on 2019-11-17 / 2019-11-18