David's Astronomy Pages
Notes - Session 803 (2020-09-01)

 
2020-09-01 (Session 803)
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
 
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (0),  Minor Issues (7),  Continuous Improvement (4)
 
Bullet Images from 2020-09-01 >>
Bullet Pulsar Dome - Corroded Home Magnet
 

Session Aims & Highlights (2020-09-01)

Main aims

  1. Targets. Acquire images of a number of targets if conditions allow.
  2. Obs.Manager. Examine response of Obs.Manager to the loss of AllSky/Weather information in the case that the AllSky/Weather computer crashes, hibernates or otherwise goes offline, which was considered a likely event given the number of daytime outages in past 48 hours.
    (in the event the AllSky/Weather computer remained responsive for the entire session.)

Equipment & Software

Highlights

Lowlights

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
Image
  
Sky Conditions (Locate Frames)
Image
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
  
Pre-Session Weather Forecast (API data from darksky.net)
Pre-Session Weather forecast showed dry conditons for the night with minimum temperature of 13°C,  but fairly cloudy in first part of night (52 to 72% cloud cover) but gradually clearing towards dawn (37 - 4% cloud cover). Wind was forecast to be moderate (20 mph), and it was not expected that conditions would be suitable for an observing session.

In the event conditions were less windy that expected and after seeing sky clearing at 01:00 - 01:30 a session was initiated via AutoStart around 01:30.
Cloud unfortunately developed around 02:30 which persisted till Dawn. Minimum outside temperature was 13.5°C.
Image   
  
Session Event Log
Time     Event Detail
01:21:34 Session Created Live Session Created (2020-09-01 S00803, ImageSaveNum: 803001)
01:21:36   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
01:23:23   Services Started Observatory Services started
01:23:31 Observatory (Auto) Observatory placed in Fully-Automated Mode
01:23:33 Session Monitoring AutoStart monitoring for Live Session opportunity starting between 01:20 & 04:10
01:23:35 Session AutoStarting Session autostarting (01:20)
01:23:37 Session Pending Session pending (2020-09-01)
01:23:39 Session Initiating Session initiating (2020-09-01)
01:23:41   Plan Requested Observing Plan requested from AstroPlan (1.16)
01:23:52   Plan Loaded Observing Plan loaded to queue (2020-09-01 V1 BEST PLAN, Plan ID: 537)
01:24:04   Camera1 Connected SBIG Camera Connected (set point -10°C)
01:24:11   Telescope Connected Telescope Connected (TheSky6)
01:24:22 Session Equilibration Session ready for dome & camera equilibration
01:25:07   Dome Opened Dome opened (opening time 45s)
01:25:10   Equilibration Started Dome Equilibration started
01:27:33   Equilibration Ended Dome Equilibration ended (2.4 mins total)
01:27:35 Session Running Session running
01:27:37   Queue Started Observing Queue started (17 targets selected)
01:28:35       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:32:26       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
01:35:17       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
01:35:20       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
01:37:36       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
01:38:01       Focusing Failed Foc2 Focusing Check Failed
01:38:04     Target Started (1/17) Target started (1/17, GCVS Z And)
01:43:27     Target Completed Target partially completed (1/17, GCVS Z And)
01:43:29     Target Started (2/17) Target started (2/17, GCVS HH And)
01:45:39       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:48:57       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
01:50:37     Target Completed Target completed (2/17, GCVS HH And)
01:50:39     Target Started (3/17) Target started (3/17, WDS GRB 34)
01:52:48       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:55:56       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
01:57:30     Target Completed Target completed (3/17, WDS GRB 34)
01:57:33     Target Started (4/17) Target started (4/17, Berkeley 63)
02:00:09       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:02:53       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
02:08:27     Target Completed Target completed (4/17, Berkeley 63)
02:08:29     Target Started (5/17) Target started (5/17, GCVS S Cyg)
02:10:40       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:13:17       Focusing Completed Foc1 AutoFocus Completed (Profile No 6)
02:22:54     Target Completed Target completed (5/17, GCVS S Cyg)
02:22:56     Target Started (6/17) Target started (6/17, GCVS SS Cyg)
02:24:34       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:27:15       Focusing Completed Foc1 AutoFocus Completed (Profile No 7)
02:30:46     Target Completed Target completed (6/17, GCVS SS Cyg)
02:30:59   SoftSuspend Called Soft Suspend is called due to Deteriorating Conditions (too few stars)
02:31:02   Queue Paused Queue paused for SoftSuspend
02:31:04 Session Suspended Session suspended
02:31:49   Dome Closed Dome closed (closing time 44s)
02:43:54     Target Cancelled Target cancelled (7/17, 61 Cyg) due to cloud
02:53:14     Target Cancelled Target cancelled (8/17, GCVS BL Lac) due to cloud
03:03:52     Target Cancelled Target cancelled (9/17, GCVS DY Per) due to cloud
03:12:50     Target Cancelled Target cancelled (10/17, GCVS CI Cyg) due to other condition
03:21:15     Target Cancelled Target cancelled (11/17, GCVS RX And) due to cloud
03:34:01     Target Cancelled Target cancelled (12/17, GCVS U And) due to cloud
03:46:42     Target Cancelled Target cancelled (13/17, GCVS TT Ari) due to cloud
03:57:59     Target Cancelled Target cancelled (14/17, GSC 1224:29) due to cloud
04:06:35     Target Cancelled Target cancelled (15/17, GCVS GK Per) due to cloud
04:25:50     Target Cancelled Target cancelled (16/17, GCVS CM Tau) due to cloud
04:47:09     Target Cancelled Target cancelled (17/17, GCVS RR Tau) due to cloud
04:47:14   Queue Completed Job Queue completed
04:47:19 Session Closing Session closing
04:47:24   Dome Closed Dome already closed (closed at 02:31, closing time 44s)
04:48:36   Dome Park Aborted Dome Park aborted (0s, Az=90.1degs)
04:49:26   Telescope Parked Telescope parked (parking time 45s)
04:49:57   Telescope Switched Off Telescope Power has been switched off via UPB Powerbox.
04:50:45   Services Stopped Night Services stopped
04:50:47 Session Housekeeping Housekeeping Started (Cleanup FITS, Create Fits Summary, Transfer Files)
04:50:49 Session Finished Session Finished
   
Session Alerts
Time     Alert Detail
04:48:36 Dome Failed To Park Parking aborted after 3 mins, Rotation Drive wheels are likely to be slipping (Dome at Az 90.1 degs)

Back to Top


Operational Issues (2020-09-01, S803)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Continuous Improvement

[ Prev | Next ]

Back to Top


Pulsar Dome - Corroded Home Magnet

After encountering some problems with relaibly performing recalibration of the Pulsar Dome, the 'Home' magnet which is using by dome controller to recognise when the dome is in it's home position was checked and found to be highly corroded. All the original casing had flaked away with a lot of semi magnetic rusted residue surrounding a central magnetic hub.   Three months later the magnet had corroded even further and dome calibration had stopped working altogether.

For occasions when the dome has lost azimuth precision, a <1 degree error is enough to prevent the two halves of the induction charger to align sufficiently well to allow effective recharging of the shutter unit battery, a work around has been discovered when after rotating the dome to the park position and with the two halves of the induction charger in alignment the ASCOM SyncToAzmiuth command can be used to reset the dome to the park azimuth (090 deg in case of my observatory)

Photo of corroded home magnet, 2020-09-01
(Magnet is about 2 years old)
   Image
  [ Larger Image ]
  

Back to Top