Session Aims & Highlights (2020-09-04)

Main aims

  1. Targets. Acquire images of a number of targets if conditions allow.
  2. AllSky/Weather Computer. Conduct live session test of new replacement AllSky/Weather Computer, ensuring it fufills it role in providing data to support Observatory operations and identify/resolve any teething issues.

Equipment & Software

Highlights

Lowlights

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
Image
  
Sky Conditions (Locate Frames)
Image
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
  
Pre-Session Weather Forecast (API data from darksky.net)
Pre-Session Weather forecast showed dry conditons for the night with minimum temperature of 13°C,  but fairly cloudy in first part of night (52 to 72% cloud cover) but gradually clearing towards dawn (37 - 4% cloud cover). Wind was forecast to be moderate (20 mph), and it was not expected that conditions would be suitable for an observing session.

In the event conditions were less windy that expected and after seeing sky clearing at 01:00 - 01:30 a session was initiated via AutoStart around 01:30.
Cloud unfortunately developed around 02:30 which persisted till Dawn. Minimum outside temperature was 13.5°C.
Image   
  
Session Event Log
Time     Event Detail
23:04:41 Session Created Live Session Created (2020-09-04 S00805, ImageSaveNum: 805001)
23:04:43   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
23:06:30   Services Started Observatory Services started
23:06:39 Observatory (Auto) Observatory placed in Fully-Automated Mode
23:06:41 Session Monitoring AutoStart monitoring for Live Session opportunity starting between 21:44 & 04:17
23:06:43   AutoStart Delayed Session delayed due to cloud
23:06:45 Session AutoStarting Session autostarting (23:04)
23:06:47 Session Pending Session pending (2020-09-04)
23:06:49 Session Initiating Session initiating (2020-09-04)
23:06:51   Plan Requested Observing Plan requested from AstroPlan (1.16)
23:07:29   Plan Loaded Observing Plan loaded to queue (2020-09-04 V1 BEST PLAN, Plan ID: 539)
23:07:41   Camera1 Connected SBIG Camera Connected (set point -15°C)
23:07:47   Telescope Connected Telescope Connected (TheSky6)
23:07:59 Session Equilibration Session ready for dome & camera equilibration
23:08:44   Dome Opened Dome opened (opening time 45s)
23:08:47   Equilibration Started Dome Equilibration started
23:10:39   Equilibration Ended Dome Equilibration ended (1.9 mins total)
23:10:41 Session Running Session running
23:10:43   Queue Started Observing Queue started (32 targets selected)
23:11:43       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:15:55       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
23:18:34       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
23:18:37       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
23:21:10       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
23:23:11       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
23:23:26       Focusing Failed Foc2 Focusing Check Failed
23:23:29     Target Missed (1/32) Target's time slot was missed (1/32, GCVS BL Lac)
23:23:31     Target Started (2/32) Target started (2/32, GCVS FG Sge)
23:25:00 Program Hung AstroMain program hung
23:29:36 Session Resumed Live Session Resumed (2020-09-04 S00805, ImageSaveNum: 805002)
23:29:51   Obs.Manager Started Obs.Manager started
23:29:53   Obs.Overseer Started Obs.Overseer started
23:29:55   Services Started Observatory Services started
23:30:01   UPB Port Lost UPB Powerbox Port Lost
23:30:27   UPB.Switch Restart UPB.Switch has been restarted.
23:31:09   Services Started Observatory Services started
23:31:57 Observatory (Auto) Observatory placed in Fully-Automated Mode
23:32:01 Session Pending Session pending (2020-09-04)
23:32:03 Session Initiating Session initiating (2020-09-04)
23:32:05   Plan Loaded Observing Plan loaded to queue (2020-09-04 V1 ACTIVE PLAN S805, Plan ID: 539)
23:32:07   Camera1 Connected SBIG Camera Connected (set point -15°C)
23:32:12   Telescope Connected Telescope Connected (TheSky6)
23:32:27 Session Equilibration Session ready for dome & camera equilibration
23:32:30   Equilibration Started Dome Equilibration started
23:32:32   Equilibration Skipped Dome Equilibration skipped by user
23:32:34 Session Running Session running
23:32:36   Queue Started Observing Queue started (30 targets selected)
23:32:38     Target Started (3/32) Target started (3/32, GCVS CI Cyg)
23:40:36     Target Completed Target completed (3/32, GCVS CI Cyg)
23:40:38     Target Started (4/32) Target started (4/32, GCVS S Cyg)
23:55:43     Target Completed Target completed (4/32, GCVS S Cyg)
23:55:45     Target Started (5/33) Target started (5/33, NGC 2782, ToO)
23:59:20   Camera1 Connected SBIG Camera Connected (set point -15°C)
00:00:37     Target Aborted (5/33) Target aborted (5/33, NGC 2782, ToO) due to GRB Alert
00:00:39     Target Started (6/34) Target started (6/34, UGC 6930, ToO)
00:02:50     Target Failed Target failed due to centering error (6/34, UGC 6930, ToO)
00:02:51 User Intervention User intervention to restart Obs.Software (attempt to cure issue saving CCD images)
00:02:52   Queue Aborted Job Queue aborted
00:03:12   Services Stopped Observatory Services stopped
00:03:18 Program Closed Program closed by User
00:03:20 Program Closed Program closed by User
00:04:31 Session Resumed Live Session Resumed (2020-09-04 S00805, ImageSaveNum: 805005)
00:04:48   Camera1 Connected SBIG Camera Connected (set point -15°C)
00:04:51   Obs.Manager Started Obs.Manager started
00:04:53   Obs.Overseer Started Obs.Overseer started
00:04:57   Services Started Observatory Services started
00:05:54   Services Started Observatory Services started
00:06:00 Program Crashed AstroMain program crashed with unhandled InvalidCastException
00:16:04 Session Resumed Live Session Resumed (2020-09-04 S00805, ImageSaveNum: 805005)
00:16:25   Obs.Manager Started Obs.Manager started
00:16:27   Obs.Overseer Started Obs.Overseer started
00:16:31   Services Started Observatory Services started
00:17:19   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
00:18:59   Services Started Observatory Services started
00:19:19 Observatory (Auto) Observatory placed in Fully-Automated Mode
00:19:22 Session Pending Session pending (2020-09-04)
00:19:24 Session Initiating Session initiating (2020-09-04)
00:19:26   Plan Loaded Observing Plan loaded to queue (2020-09-04 V1 ACTIVE PLAN S805, Plan ID: 539)
00:19:28   Camera1 Connected SBIG Camera Connected (set point -15°C)
00:19:32   Telescope Connected Telescope Connected (TheSky6)
00:19:46 Session Equilibration Session ready for dome & camera equilibration
00:19:49   Equilibration Started Dome Equilibration started
00:19:51   Equilibration Skipped Dome Equilibration skipped by user
00:19:53 Session Running Session running
00:19:55   Queue Started Observing Queue started (28 targets selected)
00:19:57     Target Missed (5/32) Target's time slot was missed (5/32, HIP 87937)
00:19:59     Target Missed (6/32) Target's time slot was missed (6/32, GCVS CY Lyr)
00:20:01     Target Started (7/32) Target started (7/32, 61 Cyg)
00:25:07     Target Completed Target partially completed (7/32, 61 Cyg)
00:25:09     Target Started (8/32) Target started (8/32, GCVS AM Her)
00:34:01     Target Completed Target completed (8/32, GCVS AM Her)
00:34:03     Target Started (9/32) Target started (9/32, GCVS Z And)
00:43:22     Target Completed Target completed (9/32, GCVS Z And)
00:43:24     Target Started (10/32) Target started (10/32, GCVS DY Per)
00:51:45   SoftSuspend Called Soft Suspend is called due to Deteriorating Conditions (too few stars)
00:53:04     Target Completed Target completed (10/32, GCVS DY Per)
00:53:06   Queue Paused Queue paused for SoftSuspend
00:53:08 Session Suspended Session suspended
00:58:06     Target Cancelled Target cancelled (11/32, GCVS Z And) due to cloud
01:06:31     Target Cancelled Target cancelled (12/32, GCVS HH And) due to cloud
01:16:14     Target Cancelled Target cancelled (13/32, GCVS DY Per) due to cloud
01:25:10     Target Cancelled Target cancelled (14/32, GCVS GK Per) due to cloud
01:40:22     Target Cancelled Target cancelled (15/32, GCVS SS Cyg) due to cloud
01:49:11     Target Cancelled Target cancelled (16/32, GCVS Z And) due to cloud
01:59:04     Target Cancelled Target cancelled (17/32, GCVS DY Per) due to cloud
02:07:44     Target Cancelled Target cancelled (18/32, GCVS HH And) due to cloud
02:15:59     Target Cancelled Target cancelled (19/32, WDS GRB 34) due to cloud
02:25:42     Target Cancelled Target cancelled (20/32, GCVS DY Per) due to cloud
02:34:38     Target Cancelled Target cancelled (21/32, GCVS GK Per) due to cloud
02:46:04     Target Cancelled Target cancelled (22/32, GCVS TT Ari) due to cloud
02:59:25     Target Cancelled Target cancelled (23/32, GCVS U And) due to cloud
03:13:31     Target Cancelled Target cancelled (24/32, GCVS U And) due to cloud
03:23:11     Target Cancelled Target cancelled (25/32, GCVS RX And) due to cloud
03:33:20   Camera1 SetPoint SBIG Camera Set Point Temperature Updated (new set point -10°C)
03:36:51     Target Cancelled Target cancelled (26/32, 68P/Klemola) due to cloud
03:47:02     Target Cancelled Target cancelled (27/32, GCVS SU Tau) due to cloud
04:06:32     Target Cancelled Target cancelled (28/32, GCVS CM Tau) due to cloud
04:17:51     Target Cancelled Target cancelled (29/32, GCVS RR Tau) due to cloud
04:26:46     Target Cancelled Target cancelled (30/32, GCVS FU Ori) due to cloud
04:28:45 Session Resuming Session resuming
04:30:15   Dome Opening Dome opening hasn't finished after 90s
04:30:26 Session Suspended Session suspended
04:36:14     Target Cancelled Target cancelled (31/32, GCVS ER UMa) due to cloud
04:40:26   Camera1 SetPoint SBIG Camera Set Point Temperature Updated (new set point -15°C)
04:49:47 Session Resuming Session resuming
04:51:17   Dome Opening Dome opening hasn't finished after 90s
04:51:28 Session Suspended Session suspended
04:57:46     Target Cancelled Target cancelled (32/32, GSC 1224:29) due to cloud
04:57:51   Queue Completed Job Queue completed
04:57:58 Session Closing Session closing
05:35:40   Services Stopped Observatory Services stopped
05:43:50 Program Closed Program closed by User
05:43:52 Program Closed Program closed by User
05:46:21 Session Resumed Live Session Resumed (2020-09-04 S00805, ImageSaveNum: 805009)
05:46:54   Obs.Manager Started Obs.Manager started
05:46:56   Obs.Overseer Started Obs.Overseer started
05:47:00   Services Started Observatory Services started
05:47:23   Telescope Switched Off Telescope Power has been switched off via UPB Powerbox.
05:48:12   UPB.Switch Restart UPB.Switch has been restarted.
05:48:45 User Intervention User request to close and finish session
05:48:47 Session Closing Session closing
05:48:49   Dome Closed Dome already closed (closure time is unknown)
05:48:51   Dome Parked Dome already parked (parking time is unknown)
05:50:05   Services Stopped Night Services stopped
05:50:07 Session Housekeeping Housekeeping Started (Cleanup FITS, Create Fits Summary, Transfer Files)
05:50:09 Session Finished Session Finished
   
Session Alerts
Time     Alert Detail
23:30:27 UPB.Switch UPB.Switch has been successfully restarted.
05:48:12 UPB.Switch UPB.Switch has been successfully restarted.

Back to Top


Operational Issues (2020-09-04, S805)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Continuous Improvement

[ Prev | Next ]

Back to Top


Replacement AllSky/Weather Computer - Goes Live (2020-09-04)

Ongoing reliability issues with the existing AllSky/Weather Computer (Acer/Windows10) have finally forced its retirement and replacement today (2020-09-04)by the new AllSky/Weather Computer (Toshiba Satellite Pro/Windows 10).  The new computer was previously setup and tested for its new role, but today it was installed in the observatory in its final position in the AllSky/Weather Cabinet, connected up and switched on.

The replacement computer was hooked up in early afternoon and AstroAllSky & Weather related software started  allowing daytime operation to be checked and reviewed prior to nightime operations and a live observing session in the evening. (2020-09-04, S805)

Teething Issues revealed during daytime operations

Teething Issues revealed during nighttime operations