David's Astronomy Pages
Notes - Session 810 (2020-09-17)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
 
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (2),  Minor Issues (3),  Continuous Improvement (2)
Bullet Images from 2020-09-17 >>
 

Session Aims & Highlights (2020-09-17)

Main aims

  1. Targets. Acquire images of a selection of targets if conditions allow.

Equipment & Software

Highlights

Lowlights

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
Image
  
Sky Conditions (Locate Frames)
Image
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
  
Pre-Session Weather Forecast (API data from darksky.net)
Pre-Session Weather forecast showed dry and relatively clear conditons for the entire night (dropping to 0-2% cloud cover , by 21:00, with cloud patch (25%) around 01:00, increasing to 12-26% cloud cover by dawn)  with minimum temperature of 11°C and  winds falling from 15 mph at dusk to 3 mph at dawn. 

In the event conditions were dry and started very clear, however cloud developed at 22:30 and cloud cover remaining at ~100% for the remainder of the night
 Winds strength drecreased through the night as per forcast, and minimum temperature was 12°C
Image   
  
Session Event Log
Time     Event Detail
20:32:32 Session Created Live Session Created (2020-09-17 S00810, ImageSaveNum: 810001)
20:32:35   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
20:34:24   Services Started Observatory Services started
20:34:33 Observatory (Auto) Observatory placed in Fully-Automated Mode
20:34:35 Session Monitoring AutoStart monitoring for Live Session opportunity starting between 20:15 & 04:50
20:34:37   AutoStart Waiting AutoStart waiting till earliest start time at 20:15
20:34:39   AutoStart Delayed Session delayed due to cloud
20:34:41 Session AutoStarting Session autostarting (20:32)
20:34:43 Session Pending Session pending (2020-09-17)
20:34:45 Session Initiating Session initiating (2020-09-17)
20:34:47   Plan Requested Observing Plan requested from AstroPlan (1.16)
20:35:47   Plan Loaded Observing Plan loaded to queue (2020-09-17 V1 BEST PLAN, Plan ID: 544)
20:35:59   Camera1 Connected SBIG Camera Connected (set point -10°C)
20:36:05   Telescope Connected Telescope Connected (TheSky6)
20:36:17 Session Equilibration Session ready for dome & camera equilibration
20:37:02   Dome Opened Dome opened (opening time 45s)
20:37:05   Equilibration Started Dome Equilibration started
20:37:07   Equilibration Ended Dome Equilibration ended (0.0 mins total)
20:37:09 Session Running Session running
20:37:11   Queue Started Observing Queue started (29 targets selected)
20:38:16       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
20:43:01       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
20:45:53       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
20:45:55       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
20:48:36       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
20:50:45       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
20:51:07       Focusing Checked Foc2 Focusing Check Succeeded
20:51:10     Target Missed (1/29) Target's time slot was missed (1/29, GCVS CY Lyr)
20:51:12     Target Started (2/29) Target started (2/29, GCVS SS Cyg)
20:54:20       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
20:57:12       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
21:00:49     Target Completed Target completed (2/29, GCVS SS Cyg)
21:06:09     Target Started (3/29) Target started (3/29, GCVS BL Lac)
21:08:49       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
21:11:29       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
21:14:58     Target Completed Target completed (3/29, GCVS BL Lac)
21:16:27     Target Started (4/29) Target started (4/29, B106)
21:18:17       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
21:21:21       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
21:49:27     Target Completed Target completed (4/29, B106)
21:49:29     Target Started (5/29) Target started (5/29, B107). Using SharpCap
22:08:17     Target Completed Target partially completed (5/29, B107)
22:08:19     Target Started (6/29) Target started (6/29, B110)
22:10:20       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
22:13:49       Focusing Completed Foc1 AutoFocus Completed (Profile No 6)
22:36:15   SoftSuspend Called Soft Suspend is called due to Deteriorating Conditions (too few stars)
22:53:10   Dome Closed Dome closed (closing time 316s)
22:54:15   Telescope Connected Telescope Connected (TheSky6)
22:55:58 User Intervention User Intervention to restart Dome Service & restart Software Suite
22:55:59 Observatory (Manual) Observatory placed in Manual Mode
22:56:55     Target Failed Target failed due to aborted (6/29, B110)
22:56:57   Queue Aborted Job Queue aborted
22:56:59   Services Stopped Observatory Services stopped
22:57:02 Program Closed Program closed by User
22:57:04 Program Closed Program closed by User
23:00:59 Session Resumed Live Session Resumed (2020-09-17 S00810, ImageSaveNum: 810041)
23:01:22   Obs.Manager Started Obs.Manager started
23:01:24   Obs.Overseer Started Obs.Overseer started
23:01:38   Services Started Observatory Services started
23:02:32   Telescope Switched Off Telescope Power has been switched off via UPB Powerbox.
23:03:03   Services Started Observatory Services started
23:03:05   Foc1 Port Changed Foc1 Port changed from to COM18
23:03:47   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
23:05:23   Services Started Observatory Services started
23:05:38   Telescope Connected Telescope Connected (TheSky6)
23:06:00   Camera1 Connected SBIG Camera Connected (set point -10°C)
23:06:25 Observatory (Auto) Observatory placed in Fully-Automated Mode
23:06:26 Session Pending Session pending (2020-09-17)
23:06:28 Session Initiating Session initiating (2020-09-17)
23:06:30   Plan Loaded Observing Plan loaded to queue (2020-09-17 V1 ACTIVE PLAN S810, Plan ID: 544)
23:06:32   Camera1 Connected SBIG Camera Connected (set point -10°C)
23:06:35   Telescope Connected Telescope Connected (TheSky6)
23:06:47 Session Equilibration Session ready for dome & camera equilibration
23:06:49 Wait On Weather Waiting For acceptable conditions
23:06:51 Session Suspended Session suspended
23:06:53   Dome Closed Dome already closed (closure time is unknown)
23:06:55   Queue Started Observing Queue started (23 targets selected)
23:06:57     Target Missed (7/29) Target's time slot was missed (7/29, GCVS V Sge)
23:06:59     Target Missed (8/29) Target's time slot was missed (8/29, 61 Cyg)
23:07:01     Target Missed (9/29) Target's time slot was missed (9/29, UGC 11964)
23:13:40     Target Cancelled Target cancelled (10/29, NGC 7550) due to cloud
23:24:50     Target Cancelled Target cancelled (11/29, WDS GRB 34) due to cloud
23:44:17     Target Cancelled Target cancelled (12/29, UGC 12506) due to cloud
00:02:39     Target Cancelled Target cancelled (13/29, NGC 7722) due to cloud
00:17:16     Target Cancelled Target cancelled (14/29, GCVS U And) due to cloud
00:26:55     Target Cancelled Target cancelled (15/29, GCVS HH And) due to cloud
00:46:22     Target Cancelled Target cancelled (16/29, UGC 6) due to cloud
01:08:44     Target Cancelled Target cancelled (17/29, UGC 1924) due to cloud
01:21:22     Target Cancelled Target cancelled (18/29, GCVS DY Per) due to cloud
01:41:14     Target Cancelled Target cancelled (19/29, NGC 2782) due to cloud
01:59:36     Target Cancelled Target cancelled (20/29, UGC 6930) due to cloud
02:10:02     Target Cancelled Target cancelled (21/29, GCVS GK Per) due to cloud
02:35:43     Target Cancelled Target cancelled (22/29, UGC 695) due to cloud
02:58:05     Target Cancelled Target cancelled (23/29, UGCA 17) due to cloud
03:35:37     Target Cancelled Target cancelled (24/29, Abell 370) due to cloud
03:57:59     Target Cancelled Target cancelled (25/29, UGCA 42) due to cloud
04:20:21     Target Cancelled Target cancelled (26/29, NGC 1128) due to cloud
04:42:43     Target Cancelled Target cancelled (27/29, NGC 1637) due to cloud
05:05:05     Target Cancelled Target cancelled (28/29, UGCA 102) due to cloud
05:28:24     Target Cancelled Target cancelled (29/29, GCVS RR Tau) due to cloud
05:28:29   Queue Completed Job Queue completed
05:28:31 Session Closing Session closing
05:28:36   Dome Closed Dome already closed (closure time is unknown)
05:28:38   Dome Parked Dome already parked (parking time is unknown)
05:29:12   Telescope Parked Telescope parked (parking time 31s)
05:29:42   Telescope Switched Off Telescope Power has been switched off via UPB Powerbox.
05:30:38   Services Stopped Night Services stopped
05:30:40 Session Housekeeping Housekeeping Started (Cleanup FITS, Create Fits Summary, Transfer Files)
05:30:49 Session Finished Session Finished
   
Session Alerts
Time     Alert Detail
-- No Alerts                --                              

Back to Top


Operational Issues (2020-09-17 S810)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Continuous Improvement

[ Prev | Next ]

Back to Top