David's Astronomy Pages
Notes - Session 1323 (2025-05-09)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (0),  Minor Issues (3),  Small Defects (3),  Continuous Improvement (2)
Bullet Images from 2025-05-09  >>         
   
Bullet Current/Latest Session >>
   

Session Aims & Highlights (2025-05-09)

Main aims

  1. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions.

 Equipment & Software

Highlights

Notes

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
  
Sky Conditions (Locate Frames)
Image 
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
  
Session Event Log
Time     Event Detail
22:03:10 Session Monitoring AutoStart monitoring for Live Session opportunity between 22:33 & 02:23
22:03:15   AutoStart Waiting AutoStart waiting till earliest start time at 22:33
22:33:58   AutoStart Delayed Session delayed due to too few stars
23:10:41 Session AutoStarting Session autostarting (23:10)
23:11:02   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
23:11:30   Camera1 Connected SBIG Camera connected (Set point -15°C)
23:11:32 Session Created Session Created (Live, 2025-05-09 S01323, ImageSaveNum: 1323001)
23:11:37   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
23:13:23   Services Started Observatory Services started
23:13:33 Observatory (Auto) Observatory placed in Fully-Automated Mode
23:13:35   AutoStart Delayed Session delayed due to too few stars
23:13:37 Session Pending Session pending (2025-05-09)
23:13:39 Session Initiating Session initiating (2025-05-09)
23:13:49   Camera1 Connected SBIG Camera connected (Set point -10°C)
23:13:51   Plan Requested Observing Plan requested from AstroPlan (1.43.6)
23:15:16   Plan Loaded Observing Plan loaded to queue (Plan ID: 1107)
23:15:57   Telescope Connected Telescope connected (TheSky6)
23:16:22 Session Equilibration Session ready to Open Dome
23:17:07   Dome Opened Dome opened (Opening time 46s, Zigbee 40s)
23:17:10 Session Running Session running
23:17:13   Queue Started Observing Queue started (13 targets selected)
23:17:15     Target Started (NrZen) Target started (Focus Field 13, HIP 63666)
23:17:28       Dome Unparked Dome unparked
23:21:09       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:24:06       Focusing Completed Foc1 AutoFocus Completed (Profile No 1, wide)
23:26:34       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
23:26:36       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
23:28:52       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
23:30:45       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
23:31:04     Target Completed (NrZen) Target completed (Focus Field 13, HIP 63666)
23:31:09     Target Started (1/13) Target started (1/13, NGC 2407 w/SN2025gmc)
23:38:44       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:41:01       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
23:57:33     Target Completed Target completed (1/13, NGC 2407 w/SN2025gmc)
23:57:38     Target Started (2/13) Target started (2/13, Vega)
00:04:23     Target Completed Target completed (2/13, Vega)
00:04:27     Target Started (3/13) Target started (3/13, UGC 12131 w/SN2025jyl)
00:24:03     Target Completed Target completed (3/13, UGC 12131 w/SN2025jyl)
00:24:07     Target Started (4/13) Target started (4/13, GCVS BL Lac)
00:27:29       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:30:13       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
00:34:15     Target Completed Target completed (4/13, GCVS BL Lac)
00:34:19     Target Started (5/13) Target started (5/13, AT2025kej)
00:37:16   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
00:37:18   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
00:37:20     Target Aborted (5/13) Target aborted (5/13, AT2025kej) due to cloud
00:37:22   Queue Paused Queue paused for Session Suspension
00:37:24 Session Suspending Session suspending
00:38:11   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
00:38:14 Session Suspended Session suspended
00:45:59     Target Cancelled Target cancelled (5/13, AT2025kej) due to cloud
00:57:55     Target Cancelled Target cancelled (6/13, T CrB) due to cloud
01:14:09 Session Resuming Session resuming
01:14:54   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
01:14:57 Session Running Session running
01:14:59   Queue Resumed Observing Queue resumed
01:15:01     Target Started (7/13) Target started (7/13, NGC 2744 w/SN2025oq)
01:23:21     Target Completed Target partially completed (7/13, NGC 2744 w/SN2025oq)
01:23:25     Target Started (8/13) Target started (8/13, GCVS RR Leo)
01:27:27       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:30:08       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
01:31:13   CcdCamera Frozen CcdCamera appears to be frozen at around 01:31 in section 'GetCameraProperties / Status'
01:31:35   SBIG Camera Take Image failed (Command timed-out)
01:31:47   CCDSoft Restarting CCDSoft being restarted (attempt to fix frozen CcdCamera)
01:31:54   SBIG Camera Reset SBIG Camera being power-cycled
01:32:48   Camera1 Connected SBIG Camera connected (Set point -15°C)
01:32:51   SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
01:34:05   SBIG Camera Take Image failed (Command timed-out)
01:34:09   CCDSoft Restarting CCDSoft being restarted (attempt to fix locked thread)
01:34:16   SBIG Camera Reset SBIG Camera being power-cycled
01:35:10   Camera1 Connected SBIG Camera connected (Set point -15°C)
01:35:12   SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
01:37:55     Target Completed Target partially completed (8/13, GCVS RR Leo)
01:37:59     Target Started (9/13) Target started (9/13, AT2023ylu (CV))
01:47:47       Dome Unparked Dome unparked
01:48:38     Target Completed Target completed (9/13, AT2023ylu (CV))
01:48:43     Target Started (10/13) Target started (10/13, ZTF24aaomlxy)
01:54:43       SoftSuspend Called Soft Suspend called due to Deteriorating Conditions (too few stars)
01:55:13       SoftSuspend Cancelled Soft Suspend is cancelled due to improved conditions
02:09:33     Target Completed Target completed (10/13, ZTF24aaomlxy)
02:09:37     Target Started (11/13) Target started (11/13, AT2022tvf)
02:13:17       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:15:53       Focusing Completed Foc1 AutoFocus Completed (Profile No 6)
02:32:43     Target Completed Target completed (11/13, AT2022tvf)
02:32:47     Target Started (12/13) Target started (12/13, AT2023tpj (CV))
02:34:52   SBIG Camera Take Image failed (Command timed-out)
02:43:29   CCDSoft Restarting CCDSoft being restarted (attempt to fix locked thread)
02:43:37   SBIG Camera Reset SBIG Camera being power-cycled
02:44:30   Camera1 Connected SBIG Camera connected (Set point -15°C)
02:44:34   SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
02:53:49     Target Completed Target partially completed (12/13, AT2023tpj (CV))
02:53:53     Target Started (13/13) Target started (13/13, AT2025fbd)
02:57:13       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:58:20   SBIG Camera Take Image failed (Command timed-out)
02:58:23   SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
02:58:55   SBIG Camera Take Image failed (Command timed-out)
02:58:58   SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
02:59:29   SBIG Camera Take Image failed (Command timed-out)
02:59:31       Focusing Failed Foc1 focusing failed - star lost
02:59:40   CCDSoft Restarting CCDSoft being restarted (attempt to fix locked thread)
02:59:47   SBIG Camera Reset SBIG Camera being power-cycled
03:00:41   Camera1 Connected SBIG Camera connected (Set point -15°C)
03:00:44   SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
03:16:42     Target Completed Target completed (13/13, AT2025fbd)
03:16:44   Queue Completed Job Queue completed
03:16:46 Session Closing Session closing
03:17:42   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
03:18:09   Dome Parked Dome parked (parking time 20s), Az: 90.0 deg
03:18:50   Telescope Parked Telescope parked (parking time 37s total)
03:19:13   Telescope State Handbox reads 'Scope parked Turn scope off.'
03:19:35   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
03:20:59   Services Stopped Night Services stopped
03:21:02 Session Finishing Session Finishing started (Create Fits Summary, Transfer Files)
03:21:14     Dome (Find Park) Find Park started (Search Az 88.0 to 92.0°, Step 0.2°, Narrow)
03:21:59     Dome Find Park found (Best Park Az 89.9°)
03:22:05     Dome Dome has been synced at park position (Az 90.0°, Adjustment: +0.1°)
03:22:07   Dome Parked Dome parked
03:22:12   Dome Charging Dome is parked and re-charging Ok (19mA)
03:22:14 Session Finished Session Finished
 
Session Alerts & Alarms
Time     Type       Name Detail
01:31:35 Red Alert SBIG Camera Alert Take Image failed (Command timed-out)
01:31:45 Red Alert CcdCamera CcdCamera appears to be frozen (last cycle at 01:31:13) in section 'GetCameraProperties / Status'
01:32:49 Green Clear SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
01:34:05 Red Alert SBIG Camera Alert Take Image failed (Command timed-out)
01:35:12 Green Clear SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
02:34:52 Red Alert SBIG Camera Alert Take Image failed (Command timed-out)
02:44:34 Green Clear SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
02:58:20 Red Alert SBIG Camera Alert Take Image failed (Command timed-out)
02:58:23 Green Clear SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
02:58:55 Red Alert SBIG Camera Alert Take Image failed (Command timed-out)
02:58:58 Green Clear SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
02:59:29 Red Alert SBIG Camera Alert Take Image failed (Command timed-out)
03:00:44 Green Clear SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
03:22:12 Green Clear Dome Charging Dome is parked and re-charging Ok (19mA)
 

Back to Top


Operational Issues (2025-05-09, S1323)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement

[ Prev | Next ]


Fig 1

[ Prev | Next ]

Back to Top