David's Astronomy Pages
Notes - Session 1450 (2026-09-08)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
Bullet Operational Issues
- Critical Issues (0),  Major Issues (0),  Minor Issues (1),  Small Defects (2),  Continuous Improvement (2)
- Figures (0)
   
Bullet Images from 2026-09-08  >>           
   
   

Session Aims & Highlights (2026-09-08)

Main aims

  1. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions.
  2. AstroMain. Check new AstroMain xx.xx  version for any issues or problems following introduction of a number of changes.

 Equipment & Software

Highlights

Notes

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
  
Sky Conditions (Locate Frames)
Image
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Note:  The NorthCam Star Count line is unreliable and should be ignored
(The AstroNorthCam 'Find' Star method is producing many false positives from clouds)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
 
Session Event Log
Time     Event Detail
22:55:53 Session Monitoring AutoStart monitoring for Live Session opportunity between 22:55 & 04:53
22:55:55 Session AutoStarting Session autostarting (22:55)
22:56:01 Session Created Session Created (Live, 2026-09-08 S01450)
22:56:03   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
22:56:25   Scope Switched On Telescope Power has been switched on via UPB Switch
22:58:12   Services Started Observatory Services started
22:58:22 Observatory (Auto) Observatory placed in Fully-Automated Mode
22:58:25 Session Pending Session pending (2026-09-08)
22:58:27 Session Initiating Session initiating (2026-09-08)
22:58:49   Camera1 Connected SBIG Camera connected (Set point -10°C)
22:58:52   Plan Requested Observing Plan requested from AstroPlan (1.47.1)
22:59:35   Plan Loaded Observing Plan loaded to queue (PlanID: 1251)
23:00:14   Telescope Connected Telescope connected (TheSky6)
23:00:38 Session Equilibration Session ready to Open Dome
23:01:24   Dome Opened Dome opened (Opening time 45s, Zigbee 39s)
23:01:26 Session Running Session running
23:01:28   Queue Started Observing Queue started (18 targets selected)
23:01:35     Target Started (NrZen) Target started (Focus Field 21, HIP 103850)
23:01:49       Dome Unparked Dome unparked
23:04:57       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:07:27       Focusing Completed Foc1 AutoFocus Completed (Profile No 1, wide)
23:09:38       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
23:09:45       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
23:11:45       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
23:13:35       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
23:13:57     Target Completed (NrZen) Target completed (Focus Field 21, HIP 103850)
23:15:20     Target Started (1/18) Target started (1/18, GCVS CI Cyg)
23:18:35   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
23:18:37   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
23:18:39     Target Aborted (1/18) Target aborted (1/18, GCVS CI Cyg) due to cloud
23:18:41   Queue Paused Queue paused for Session Suspension
23:18:43 Session Suspending Session suspending
23:19:30   Dome Closed Dome closed (Closing time 49s, Zigbee 42s)
23:19:33 Session Suspended Session suspended
23:25:24     Target Cancelled Target cancelled (1/18, GCVS CI Cyg) due to wind
00:22:59     Target Cancelled Target cancelled (2/18, NGC 7293) due to wind
00:44:19     Target Cancelled Target cancelled (3/18, NGC 7331 w/SN2026aaiv) due to wind
00:46:29 Session Resuming Session resuming
00:47:14   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
00:47:16 Session Running Session running
00:47:18   Queue Resumed Observing Queue resumed
00:47:21     Target Started (4/18) Target started (4/18, Nova Aql 2026 (Nova))
00:52:36       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-LSI)
01:03:00   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
01:03:02   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
01:03:04     Target Aborted (4/18) Target aborted (4/18, Nova Aql 2026 (Nova)) due to cloud
01:03:06   Queue Paused Queue paused for Session Suspension
01:03:08 Session Suspending Session suspending
01:03:55   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
01:03:58 Session Suspended Session suspended
01:06:27     Target Cancelled Target cancelled (4/18, Nova Aql 2026 (Nova)) due to cloud
01:17:15     Target Cancelled Target cancelled (5/18, GCVS BL Lac) due to cloud
01:37:15     Target Cancelled Target cancelled (6/18, M31 w/AT2026vdo) due to cloud
01:53:30 Session Resuming Session resuming
01:54:15   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
01:54:17 Session Running Session running
01:54:19   Queue Resumed Observing Queue resumed
01:54:22     Target Started (7/18) Target started (7/18, M31 w/AT2026aabo)
02:04:30     Target Completed Target partially completed (7/18, M31 w/AT2026aabo)
02:04:34     Target Started (8/18) Target started (8/18, GCVS DY Per)
02:07:21   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
02:07:23   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
02:07:32     Target Aborted (8/18) Target aborted (8/18, GCVS DY Per) due to cloud
02:07:34   Queue Paused Queue paused for Session Suspension
02:07:36 Session Suspending Session suspending
02:08:26   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
02:08:28 Session Suspended Session suspended
02:10:31 Session Resuming Session resuming
02:11:16   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
02:11:19 Session Running Session running
02:11:21   Queue Resumed Observing Queue resumed
02:11:23     Target Started (8/18) Target started (8/18, GCVS DY Per)
02:16:49     Target Completed Target completed (8/18, GCVS DY Per)
02:16:53     Target Started (9/18) Target started (9/18, AT2026yvx)
02:28:08   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
02:28:10   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
02:28:12     Target Aborted (9/18) Target aborted (9/18, AT2026yvx) due to cloud
02:28:14   Queue Paused Queue paused for Session Suspension
02:28:16 Session Suspending Session suspending
02:29:03   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
02:29:05 Session Suspended Session suspended
02:32:20     Target Cancelled Target cancelled (9/18, AT2026yvx) due to cloud
02:54:41     Target Cancelled Target cancelled (10/18, SHK 31) due to cloud
03:09:52     Target Cancelled Target cancelled (11/18, Gliese 65) due to cloud
03:22:50     Target Cancelled Target cancelled (12/18, GSC 1224:29) due to cloud
03:42:05     Target Cancelled Target cancelled (13/18, AT2026yvy) due to cloud
03:58:37     Target Cancelled Target cancelled (14/18, C/2022 N2 (PANSTARRS)) due to cloud
04:05:27 Session Resuming Session resuming
04:06:12   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
04:06:14 Session Running Session running
04:06:16   Queue Resumed Observing Queue resumed
04:06:19     Target Started (15/18) Target started (15/18, UGC 4424 w/AT2026aaee)
04:17:07   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
04:17:09   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
04:17:12     Target Aborted (15/18) Target aborted (15/18, UGC 4424 w/AT2026aaee) due to cloud
04:17:14   Queue Paused Queue paused for Session Suspension
04:17:16 Session Suspending Session suspending
04:18:03   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
04:18:06 Session Suspended Session suspended
04:18:57     Target Cancelled Target cancelled (15/18, UGC 4424 w/AT2026aaee) due to cloud
04:20:08 Session Resuming Session resuming
04:20:53   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
04:20:56 Session Running Session running
04:20:58   Queue Resumed Observing Queue resumed
04:21:00     Target Started (16/18) Target started (16/18, GCVS RZ LMi)
04:27:02       Focusing Skipped Foc1 focusing skipped - star is lost (TCF-LSI)
04:32:57     Target Completed Target completed (16/18, GCVS RZ LMi)
04:33:39     Target Started (17/18) Target started (17/18, GCVS GK Per)
04:35:19   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
04:35:21   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
04:35:24     Target Aborted (17/18) Target aborted (17/18, GCVS GK Per) due to cloud
04:35:26   Queue Paused Queue paused for Session Suspension
04:35:28 Session Suspending Session suspending
04:36:15   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
04:36:17 Session Suspended Session suspended
04:43:01     Target Cancelled Target cancelled (17/18, GCVS GK Per) due to cloud
04:47:41 Session Resuming Session resuming
04:48:26   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
04:48:29 Session Running Session running
04:48:31   Queue Resumed Observing Queue resumed
04:48:33     Target Started (18/18) Target started (18/18, GCVS RR Tau)
04:57:08     Target Completed Target completed (18/18, GCVS RR Tau)
04:57:10   Queue Completed Job Queue completed
04:57:11 Session Closing Session closing
04:58:02   Dome Closed Dome closed (Closing time 49s, Zigbee 43s)
04:58:28   Dome Parked Dome parked (parking time 19s), Az: 90.0 deg
04:59:10   Telescope Parked Telescope parked (parking time 37s total)
04:59:33   Telescope State Handbox reads 'Scope parked Turn scope off.'
05:00:30   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
05:01:54   Services Stopped Night Services stopped
05:01:57 Session Finishing Session Finishing started (Create Fits Summary, Transfer Files)
05:02:19     Dome (Find Park) Find Park started (Search Az 88.0 to 92.0°, Step 0.2°, Narrow)
05:03:07     Dome Find Park found (Best Park Az 90.2°)
05:03:13     Dome Dome has been synced at park position (Az 90.0°, Adjustment: -0.2°)
05:03:15   Dome Parked Dome parked
05:06:17   Dome Charging Dome hasn't started re-charging after 3.1 minutes
05:06:19 Session Finished Session Finished
 
Session Alerts & Alarms
Time     Type       Name Detail
05:06:17 Yellow Alert Dome Charging Dome hasn't started re-charging after 3.1 minutes
 

Back to Top


Operational Issues (2026-09-08 S1450)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement

[ Prev | Next ]

Back to Top Issue,  Back to Top


Fig 1. Slewing Performance Session S1450

Image

 

Fig 2. Slewing Performance Session S1452 after telescope realignment during session S1451.

Image

 

[ Prev | Next ]

Back to Top Issue,  Back to Top