Notes - Session 610.2  (2018-05-08, Observatory Commissioning)

   
Bullet Session Aims & Highlights
   
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (0),  Minor Issues (0),  Small Defects (0),  Continuous Improvement (0)
 
Bullet No images from this session  >>

Session Aims & Highlights (2018-05-08)

Main aims

This was a night-time session were to continue formal commissioning of the new Dome Observatory including :

  1. General. Check observatory for any general issues & problems (night time access, lights, safety, equipment start up etc)
  2. Dome Slaving. Operate telescope and dome together using POTH.Hub with dome slaving
  3. Telescope Park. Confirm telescope start up from Parked Position, align on star & synchronise
  4. Observatory Shutdown. Test observatory shutdown including Close Shutter, Park Dome & Park Telescope
  5. System Stability. Check stability of the overall system (POTH.Hub and observatory control software)

Equipment & Software

Highlights

Notes

Summary Plots & Logs

Night Sky Summary Plot - 2018-05-08
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
 
 

Back to Top


Operational Issues (2018-05-08, S610.2)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement