Notes - Session 615  (2018-07-24)

   
Bullet Session Aims & Highlights
 - Executed Observing Plan
 - Night Summary Plot
   
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (0),  Minor Issues (0),  Small Defects (0),  Continuous Improvement (0)
   
Bullet Observing Plan
Bullet Fully Automated Operations Test
 
Bullet Images from 2018-07-24  >>
 
 

Session Aims & Highlights (2018-07-24) - Commissioning

Main aims of this nighttime session was to continue commissioning of Clair3 Observatory including

1) Perform live test of Observatory System operating in Fully Automated Mode

(This follows corrections and modifications to code since previous live test sessions on 018-07-18 and 2018-07-22.  Although operating in  Fully Automated Mode the session was again closely monitored to understand any issues and intervene if required)

2) Acquire some images

3) Continue checking stability of POTH.Hub (Telescope + Dome) & Observatory Control Software

Equipment & Software
- 12" LX200 and ST-10XME
- CCDApp2, TheSky6, CCDSoft 5, POTH Hub,

Highlights :

- The new Fully-Automated Operation Routines generally worked as designed but again a few further few things were noticed that will require further correction and improvement.  The test can be judged a success  (see test notes)

- Specific successful achivements of the automated system  : 
    - a new session (session ID, session name, session folders) was created for the night
    - an optimised Observing Plan/Schedule was created for the night from a database of targets and loaded ready for observing
    - Dome, Telescope and CCD Camera were connected to
    - Temperature Set Point on CCD Camera was set (based on ambient temperture)
    - Dome, Telescope and CCD Camera were operated 
    - Weather and Cloud Sensor data was used to open and close the Dome Shutter several times during the session
    - Execution of Observing Plan / Target Queue proceeded according to scheduled start times.
    - Close down of the Observatory (Telescope & Dome Parking, CCD Disconnection)
    - Post Session Housekeeping (File copying etc)

   (Wait to Next Night and Commence Next Session were not tested on this occassion)
  
- No specific failures of the automated system, however efficiency was rather poor due to shutter closures due to borderline cloud conditions and skipped targets due to previous targets overrun their respective time slot.
  
- A long list of corrections/minor improvements to the routines were identified.  Major items that needed to be attended to are:
    - Stop target imaging before each target overruns its time slot
    - Tidy up and rationalise routines dealing with Session Closing and Session Housekeeping
    - Autofocussing (previously noted)
    - Access (and Use) Centering Offsets held in Targets Database

- Images of several targets were obtained

- A bug within new Target/Job Queue routines meant that Mosaic (M11) could not be acquired.

- There were with no major issues with the Observatory System itself, except for an outage of the Cloud Detector

 
Executed Observing Plan (2018-07-24)
(Targets marked with Red Status failed. Initial targets failed due to missing the scheduled start time.
Later targets failed due to cloud/closed dome.
 
Image
 
Night Sky Summary Plot - 2018-07-24
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
 
Image
 


Back to Top


Operational Issues (2018-07-24, S615)

Issues arising during the session:

Observatory Software Issues
 
Shutter repeatedly Closing & Opening within Short Interval (02:04 to 02:16 Local)

Observatory Alert                       2018-07-25 02:04 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter

Session Suspended                       2018-07-25 02:04 (Local)
  Session: 2018-07-24         Info      Session suspended
(..)
  Close Shutter...            Ok        Shutter is closing...
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...

Observatory Alert                       2018-07-25 02:04 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
  Close Shutter...            Ok        Shutter is closed (40s)

  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  
Open Shutter...             Ok        Shutter is open (45s)

Observatory Alert                       2018-07-25 02:11 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter

Session Suspended                       2018-07-25 02:11 (Local)
  Session: 2018-07-24         Info      Session suspended
(..)
  Close Shutter...            Ok        Shutter is closing...
  Close Shutter...            Ok        Shutter is closed (45s)
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again

  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...
  Open Shutter...             Ok        Shutter is open (45s)

  Continue..
  Checking Target ...         Ok        RA: 19 14 36.399, Dec: -02 42 22.00, J2000 (NGC 6772)
  Checking Altitude ...       Ok        Altitude 25.1 degs
  Checking Airmass ...        Ok        Airmass 2.35
  Checking Declination...     Ok        Dec -2.67 degs
  Slewing ...                 

Observatory Alert                       2018-07-25 02:15 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter

Session Suspended                       2018-07-25 02:15 (Local)
  Session: 2018-07-24         Info      Session suspended
(..)
  Close Shutter...            Ok        Shutter is closing...
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again

  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...

Observatory Alert                       2018-07-25 02:16 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again

        
  Open Shutter...             Ok        Shutter is open (35s)
  
'Bad' Clarity Values causing momentary 'Must Close' Flags
Unexplained spikes in Clarity between 02:04 and 02:16 LT.
The Scorecard Routine interprets these as Critical Cloud and as a consequence
Shutter Safety is momentarily set to 'Must Close'.
Image
 

Back to Top


Fully- Automated Operations Test (2018-07-24)

With key hardware powered up (Observatory Laptop, Dome, Telescope and CCD Camera),  key software running (TheSky6, CCDSoft5 and CCDApp2) and key observatory services started (Observatory Manager, Weather/Cloud Sensor, ASCOM Dome, ASCOM Scope), and the Telescope Focussed & Synced on a known startfield, the observatory manager control was placed into 'Fully-Automated' Mode (see screenshot). This initiated the Fully-Automated cycle of operation, comprising the following session states : Pending, Initiating, Starting, Equilibrating, Running (or Suspended), Closing, Housekeeping, Finished, Back to Pending.


Observatory Mode                        2018-07-25 01:19 (Local)
  Setting Mode...             Ok        Fully-Automated
 

The Session began in the 'Pending' State, but as the Sun had already set (Sun Altitude < 0) the Session immediately moved to 'Initiating' where the routine picked up a previously created (Quick-Plan) observing plan for the night with a scheduled start time equivalent to a sun altitude of -9 deg. Once created the observing plan was successfully loaded into the Target/Job Queue ready for execution.  (Note: execution commenced after midnight and therefore the local time dates shown (2018-07-25) appear to differ from the night date (2018-07-24), but this is normal/okay)


Session Pending                         2018-07-25 01:19 (Local)
  NightDate:                  Ok        2018-07-24       (NightDate)

Session Initiating                      2018-07-25 01:19 (Local)
  NightDate:                  Ok        2018-07-24       (NightDate)
  Import Observing Plan...
  Selecting Plan...           Ok        2018-07-24   V1   QUICK PLAN   (Plan ID: 166)
  Retrieving Targets ...      Ok        24 Targets. 
  Reading Start Time...       Ok        2018-07-24 23:14 (Scheduled StartTime, Local)
 

The Session then moved to 'Starting'  where CCD Camera and Telescope were successfully connected (a CCD Temperature Set Point of -10 degC was selected and used.  Session setup was successfully performed (new Session ID, Session Name and Session Folders).  


Session                                 2018-07-25 01:19 (Local)
  Session Name:               Ok        2018-07-24 S00615 (Session)
  Creating session folder ... Ok        .\New\2018-07-24 S00615
  Creating analysis folder ...Ok        .\...\2018-07-24 S00615
  Creating subfolders ...     Ok        .\...\2018-07-24 S00615\_RAW, \_REDUCED etc
  Stopping CCDSoft            Ok        
  Setting Autosave Number     Ok        615001
  Restarting CCDSoft
  Creating Camera object...   Ok        CCDsoft.Camera
  Creating Autoguider object..Ok        CCDsoft.Camera
  Creating Folder object..    Ok        CCDSoft.Folder
  Reconnecting camera ...

Connect Camera                          2018-07-25 01:20 (Local)
  Connecting camera...        Ok
  Temperature Regulation...   Ok
  Temperature Set Point...    Ok        -10 °C
  TempMonitor:                Ok        Already active

  Setting AutoSave Folder ... Ok        .\New\2018-07-24 S00615
 

The Session then moved to 'Equilibrating', but since the Scheduled Plan's Start Time has already been passed the minimum equilibration time of 5 minutes was employed  (the CCD Temperature Set Point was manually reset to -15 degC as -10 degC was too high for the ambient conditions).


Session Equilibrating                   2018-07-25 01:20 (Local)
  Dome Equilibration:         Started   2018-07-25 01:20 (Local)
  Turn off Dome Slaving...    Ok        Dome Slaving is OFF
    Rotating Dome into wind             Wind Direction 270°
    Obs.T - Amb.T at 01:20    +1.0°C    Obs. 11.7 °C, Scope 10.0 °C, Amb. 10.7 °C, CCD 10.2 °C
    Obs.T - Amb.T at 01:21    +1.0°C    Obs. 11.7 °C, Scope 9.9 °C, Amb. 10.7 °C, CCD -3.2 °C
    Obs.T - Amb.T at 01:22    +1.0°C    Obs. 11.7 °C, Scope 9.9 °C, Amb. 10.7 °C, CCD -11.0 °C
  Updating Setpoint...        Ok        -15 °C  (<<<< Manual Operation)
    Obs.T - Amb.T at 01:23    +0.9°C    Obs. 11.6 °C, Scope 9.9 °C, Amb. 10.7 °C, CCD -14.4 °C
  Dome Equilibration:         Stopped   4.0 mins (4.0 mins total)

 

 The Session moved to 'Running' and began executing the Job Queue. 


Session Running                         2018-07-25 01:24 (Local)
  NightDate:                  Ok        2018-07-24       (NightDate)
  Turn on Dome Slaving...     Ok        Dome Slaving is ON
  Turn On Tracking..          Ok        Telescope Tracking is ON

Take Frame Jobs (Live MODE)             2018-07-25 01:24 (Local)
  Checking Plan...            Ok        2018-07-24   V1   QUICK PLAN           (Plan ID= 166)
  Checking Targets...         Ok        5 targets selected
  AutoSave Folder...          Ok        C:\Data\CCD Imaging\New\2018-07-24 S00615
  AutoSave Start Num...       Ok        615001
  Date/Time (TheSky6)...      Ok        2018-07-25 01:24:08 (Local)
                                        2018-07-25 00:24:08 (UT)
  Lat/Long (TheSky6)...       Ok        57 19 09.00 N / 02 00 24.99 W
  CCD Regulation ...          Ok        Regulation is ON (Setpoint: -15.0 °C)
  Checking CCD Temp...        Warning   Temp [-16.5 °C] is 1.5 °C below setpoint
  Airmass Cutoff...           Ok        Airmass 3.3
  Checking Targets ...        Ok        24 targets selected
  Setting Up RealTime VMA...  Ok        (1.2 Method)
  Checking VMA Folders ...    Ok        
  Reading Reference File ...  Ok        ..\Reference\ProjectStars.txt
  Estimated Duration...                 59.03 mins
GCVS U And  (20/24)                     2018-07-25 01:24 (Local)
  Target:                     Ok        GCVS U And (ID: 219)
  Object Type:                Ok        Mira variable
  Constellation:              Ok        AND
  Comment:                    Ok        And U
  Observation Type:           Ok        Regular/One-Off
  Checking Start Time ...     Ok        Wait till 02:18 to commence target (54.7 mins)
 

It was quickly apparent that the Observatory Manager was using a non-optimised Quick Test plan. The Observatory was switched to Manual Mode and the Job Queue aborted. (The Observatory manager had loaded an existing test plan for the night (a non-optimsed plan (nPopulation 1, nGeneration 1) created as part of daytime testing) and had passed over the expected step of creating and using a properly optimised plan for the night that would be created with optimisations parameters  (nPopulation 200, nGeneration 40) )


Observatory Mode                        2018-07-25 01:25 (Local)
  Setting Mode ...            Ok        Manual

Script Aborting ...           Aborted   (Script aborted by user)

A V2 Plan was then 'manually' created in the 'Observing Database Tool ' (SqlForms2/Schedule Builder) using full optimisation parameters.

Observatory control was then put back into 'Fully-Automated' Mode  and the Session quickly moved through the initial states, loading the new V2 plan and re-performing a 5 minute equilibration period.


Observatory Mode                        2018-07-25 01:28 (Local)
  Setting Mode...             Ok        Fully-Automated

Session Pending                         2018-07-25 01:28 (Local)
  NightDate:                  Ok        2018-07-24       (NightDate)

Session Initiating                      2018-07-25 01:28 (Local)
  NightDate:                  Ok        2018-07-24       (NightDate)
  Import Observing Plan...
  Selecting Plan...           Ok        2018-07-24   V2   BEST PLAN   (Plan ID: 167)
  Retrieving Targets ...      Ok        29 Targets. 
  Reading Start Time...       Ok        2018-07-24 23:14 (Scheduled StartTime, Local)

Session Starting                        2018-07-25 01:28 (Local)
  Session:                    Ok        2018-07-24       (NightDate)

Connect Camera                          2018-07-25 01:28 (Local)
  Connecting camera...        Ok
  Temperature Regulation...   Ok
  Temperature Set Point...    Ok        -10 °C
  TempMonitor:                Ok        Already active

Connect Telescope                       2018-07-25 01:28 (Local)
  Establishing link...        Ok
  Telescope Coords...         Ok        Az: 190.9, Alt: 41.4
  Turn Off Tracking..         Ok        Telescope Tracking is OFF
  A session (S00615) has already been created  in the database for 2018-07-24
  Session : 2018-07-24 S00615
  Setting AutoSave Folder ... Ok        .\New\2018-07-24 S00615

Session                                 2018-07-25 01:28 (Local)
  Session Name:               Ok        2018-07-24 S00615 (Session)
  Reusing Session Folder...   Ok        .\New\2018-07-24 S00615
  Reusing Analysis Folder...  Ok        .\...\2018-07-24 S00615
  AutoSave Folder...          Ok        C:\Data\CCD Imaging\New\2018-07-24 S00615
  AutoSave Start Num...       Ok        615001

Session Equilibrating                   2018-07-25 01:28 (Local)
  Dome Equilibration:         Started   2018-07-25 01:28 (Local)
  Turn off Dome Slaving...    Ok        Dome Slaving is OFF
    Rotating Dome into wind             Wind Direction 270°
    Obs.T - Amb.T at 01:28    +0.9°C    Obs. 11.5 °C, Scope 9.7 °C, Amb. 10.6 °C, CCD -14.8 °C
    Obs.T - Amb.T at 01:29    +0.8°C    Obs. 11.4 °C, Scope 9.7 °C, Amb. 10.6 °C, CCD -12.7 °C
  Updating Setpoint...        Ok        -15 °C
    Obs.T - Amb.T at 01:30    +0.7°C    Obs. 11.4 °C, Scope 9.7 °C, Amb. 10.7 °C, CCD -16.5 °C
    Obs.T - Amb.T at 01:31    +0.8°C    Obs. 11.4 °C, Scope 9.7 °C, Amb. 10.6 °C, CCD -16.1 °C
  Dome Equilibration:         Stopped   4.0 mins (4.0 mins total)

After 4 minutes of allotted equilibration the session moved to 'Running' and begun executing the Job Queue.  


Session Running                         2018-07-25 01:32 (Local)
  NightDate:                  Ok        2018-07-24       (NightDate)
  Turn on Dome Slaving...     Ok        Dome Slaving is ON
  Turn On Tracking..          Ok        Telescope Tracking is ON
Take Frame Jobs (Live MODE)             2018-07-25 01:32 (Local)
  Checking Plan...            Ok        2018-07-24   V2   BEST PLAN            (Plan ID= 167)
  Checking Targets...         Ok        29 targets selected
  AutoSave Folder...          Ok        C:\Data\CCD Imaging\New\2018-07-24 S00615
  AutoSave Start Num...       Ok        615001
  Date/Time (TheSky6)...      Ok        2018-07-25 01:32:29 (Local)
                                        2018-07-25 00:32:29 (UT)
  Lat/Long (TheSky6)...       Ok        57 19 09.00 N / 02 00 24.99 W
  CCD Regulation ...          Ok        Regulation is ON (Setpoint: -15.0 °C)
  Checking CCD Temp...        Ok        -14.8 °C (67%)
  Airmass Cutoff...           Ok        Airmass 3.3
  Checking Targets ...        Ok        29 targets selected
  Setting Up RealTime VMA...  Ok        (1.2 Method)
  Checking VMA Folders ...    Ok        
  Reading Reference File ...  Ok        ..\Reference\ProjectStars.txt
  Estimated Duration...                 260.12 mins

 

This was a late night test and since the scheduled start times for the first 16 targets had already been passed, they were skipped and flagged as 'Failed / MissedStart' [ It may be better to flag these targets as 'Failed / BeforeSession' to distinguish them from targets that fail due to the prior target overrunning its time slot ]


NGC 6842  (1/29)                        2018-07-25 01:32 (Local)
  Target:                     Ok        NGC 6842 (ID: 156)
  Object Type:                Ok        Pl. Neb
  Constellation:              Ok        Vul
  Comment:                    Missing   
  Observation Type:           Ok        Regular/One-Off
  Checking Start Time ...     Fail      Planned Start Time (23:14) has been missed. Target will be skipped
 Target 2/29 to 16/29

 [ lines removed for brevity ]

 Checking Start Time ...     Fail      Planned Start Time has been missed. Target will be skipped

 

The  17th to 19th targets (NGC 7086, Z And & RX And) were executed successfully . The 20th Target (M11 Mosaic) failed (it seems that the Mosaic Coordinates filename was not retrieved  from QL database or otherwise couldn't be found).   Execution then moved on to the 21st target  (NGC 6772) but due to the failure of the previous target, it required an 18 minute wait until the it's scheduled start time arrived. During this period the Session was suspended (shutter closed)  and resumed (shutter opened) 3 or 4 times
[ probably need a smarter way for managing open/close shutter when cloud conditions are borderline ].


NGC 7086  (17/29)                       2018-07-25 01:32 (Local)
  Target:                     Ok        NGC 7086 (ID: 61)
  Object Type:                Ok        Open Cluster

  Checking Start Time ...     Ok        Wait till 01:40 to commence target (7.6 mins)
  Waiting till 01:40...

  Continue..
 [ lines removed for brevity ]

  Taking 15s image (C)...     Ok        [00615010] 00:45:10 (UT)  Full 3x3 15s C
  Taking 15s image (C)...     Ok        [00615011] 00:45:35 (UT)  Full 3x3 15s C
GCVS Z And  (18/29)                     2018-07-25 01:45 (Local)

GCVS RX And  (19/29)                    2018-07-25 01:52 (Local)

  [ lines removed for brevity ]
  Taking 10s image (V)...     Ok        [00615105] 00:57:46 (UT)  Full 3x3 10s V

  Taking 8s image (R)...      Ok        [00615106] 00:58:13 (UT)  Full 3x3 8s R
M11 Mosaic - Mosaic  (20/29)            2018-07-25 01:58 (Local)
  Target:                     Ok        M11 Mosaic (ID: 374)
  Object Type:                Ok        Open Custer

  Observation Type:           Ok        Mosaic
  Checking Start Time ...     Ok        

  Checking CCD Temp...        Ok        -15.2 °C (73%)
  Checking Focuser ...        Ok        Tube Temp: 9.3 °C
  Reading Mosaic Points...    Fail      ()
NGC 6772  (21/29)                       2018-07-25 01:58 (Local)
  Target:                     Ok        NGC 6772 (ID: 32)
  Object Type:                Ok        Pl. Neb

  Checking Start Time ...     Ok        Wait till 02:16 to commence target (18.0 mins)
  Waiting till 02:16...
Observatory Alert                       2018-07-25 02:04 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
Session Suspended                       2018-07-25 02:04 (Local)
  Session: 2018-07-24         Info      Session suspended
  Close Shutter...            Ok        Shutter is closing...
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...
Observatory Alert                       2018-07-25 02:04 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
  Close Shutter...            Ok        Shutter is closed (40s)
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  Open Shutter...             Ok        Shutter is open (45s)
Observatory Alert                       2018-07-25 02:11 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
Session Suspended                       2018-07-25 02:11 (Local)
  Session: 2018-07-24         Info      Session suspended
  Close Shutter...            Ok        Shutter is closing...
  Close Shutter...            Ok        Shutter is closed (45s)
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...
  Open Shutter...             Ok        Shutter is open (45s)

  Continue..
  Checking Target ...         Ok        RA: 19 14 36.399, Dec: -02 42 22.00, J2000 (NGC 6772)
  Checking Altitude ...       Ok        Altitude 25.1 degs
  Checking Airmass ...        Ok        Airmass 2.35
  Checking Declination...     Ok        Dec -2.67 degs
  Slewing ...                 
Observatory Alert                       2018-07-25 02:15 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
Session Suspended                       2018-07-25 02:15 (Local)
  Session: 2018-07-24         Info      Session suspended
  Close Shutter...            Ok        Shutter is closing...
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...
Observatory Alert                       2018-07-25 02:16 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
Ok        
  Waiting for scope...        
  Open Shutter...             Ok        Shutter is open (35s)
Ok        2.0s
 [ lines removed for brevity ]

  Taking 60s image (C)...     Ok        [00615112] 01:23:14 (UT)  Full 3x3 60s C
  Taking 60s image (C)...     Ok        [00615113] 01:24:27 (UT)  Full 3x3 60s C


Conditions improved and the 21st to 23rd targets (NGC 6772,  M73 & NGC 7009) were successfully executed.   The scheduled start time for the 24th target was missed by less than one minute), leaving the 25th target (HIP 110661) to have to wait 4.5 minutes for its scheduled start time to arrive.


M73  (22/29)                            2018-07-25 02:25 (Local)
  Target:                     Ok        M73 (ID: 50)
  Object Type:                Ok        Open Cluster

  Checking Start Time ...     Ok        

  [ lines removed for brevity ]

  Taking 10s image (C)...     Ok        [00615123] 01:30:52 (UT)  Full 3x3 10s C
  Taking 10s image (C)...     Ok        [00615124] 01:31:12 (UT)  Full 3x3 10s C
NGC 7009  (23/29)                       2018-07-25 02:31 (Local)
  Target:                     Ok        NGC 7009 (ID: 58)
  Object Type:                Ok        Pl. Neb

  Checking Start Time ...     Ok  

  [ lines removed for brevity ]      


  Taking 10s image (C)...     Ok        [00615134] 01:38:08 (UT)  Full 3x3 10s C
  Taking 10s image (C)...     Ok        [00615135] 01:38:28 (UT)  Full 3x3 10s C

61 Cyg  (24/29)                         2018-07-25 02:38 (Local)
  Target:                     Ok        61 Cyg (ID: 15)
  Object Type:                Ok        Nearby Star

  Checking Start Time ...     Fail      Planned Start Time (02:38) has been missed. Target will be skipped
HIP 110661  (25/29)                     2018-07-25 02:38 (Local)
  Target:                     Ok        HIP 110661 (ID: 195)
  Object Type:                Missing   

  Checking Start Time ...     Ok        Wait till 02:43 to commence target (4.6 mins)
  Waiting till 02:43...

  Continue..

 

This target took a long time to center - image linking slow due image containing a large number of star objects (can SExtractor parameters be better optimised ?) and the target overran its time slot by some 8 minutes.  The 26th target was skipped due to missing its start time and execution moved to the 27th Target (NGC 100).  The 28th target missed its start time by less than one minute), leaving the 29th and final target (NGC 309) to have to wait nearly 12 minutes for its scheduled start time to arrive.  During this time conditions deteriorated and the shutter was shut.   Locate images were eventually taken but looked so bad that it was decided to abort the target. 

  Continue..                            (<<<<  Continue with HIP 110661  (25/29) )
  
  [ lines removed for brevity ]      

  Checking position (1)
  Taking 5s image (C)...      Ok        [00615136] 01:43:11 (UT)  Full Locate C
  Linking image (UCA/USNO)... Failed    No Acceptable Match Found
  Linking image (GSC)...      Failed    No Acceptable Match Found
  Linking image (UCA/USNO*)...Ok        Stars 246, Scale 1.326, Angle 179.91°
  Reviewing position (1)...   Ok        Position error: 6.2 arc mins
  Jogging ...                 Ok        Correction:     6.5 arc mins 

  Checking position (2)
  Taking 5s image (C)...      Ok        [00615137] 01:47:18 (UT)  Full Locate C
  Linking image (UCA/USNO)... Failed    No Acceptable Match Found
  Linking image (GSC)...      Failed    No Acceptable Match Found
  Linking image (UCA/USNO*)...Ok        Stars 229, Scale 1.326, Angle 179.82°
  Reviewing position (2)...   Ok        Position error: 2.2 arc mins
  Jogging ...                 Ok        Correction:     1.6 arc mins 

  Checking position (3)
  Taking 5s image (C)...      Ok        [00615138] 01:49:36 (UT)  Full Locate C
  Linking image (UCA/USNO)... Failed    No Acceptable Match Found
  Linking image (GSC)...      Failed    No Acceptable Match Found
  Linking image (UCA/USNO*)...Ok        Stars 210, Scale 1.326, Angle 179.84°
  Reviewing position (3)...   Ok        Position error: 0.5 arc mins
  Jogging ...                 Ok        Correction:     1.5 arc mins 
  Acceptance test ...         Passed    Pointing within 1.5 arc mins

 [ lines removed for brevity ]      

  Taking 2s image (S)...      Ok        [00615145] 01:56:04 (UT)  Full 2x2 2s S
  Taking 2s image (S)...      Ok        [00615146] 01:56:20 (UT)  Full 2x2 2s S
GCVS IP Peg  (26/29)                    2018-07-25 02:56 (Local)
  Target:                     Ok        GCVS IP Peg (ID: 144)
  Object Type:                Ok        Eclipsing CV

  Checking Start Time ...     Fail      Planned Start Time (02:48) has been missed. Target will be skipped

NGC 100  (27/29)                        2018-07-25 02:56 (Local)
  Target:                     Ok        NGC 100 (ID: 45)
  Object Type:                Ok        Spiral Galaxy
  Checking Start Time ...     Ok        Wait till 02:58 to commence target (2.1 mins)
  Waiting till 02:58...

  Continue..

 [ lines removed for brevity ]      

  Taking 30s image (C)...     Ok        [00615162] 02:10:05 (UT)  Full 3x3 30s C
  Taking 30s image (C)...     Ok        [00615163] 02:10:45 (UT)  Full 3x3 30s C
Hickson 5  (28/29)                      2018-07-25 03:11 (Local)
  Target:                     Ok        Hickson 5 (ID: 159)
  Object Type:                Ok        Galaxy Cluster

  Checking Start Time ...     Fail      Planned Start Time (03:11) has been missed. Target will be skipped
NGC 309  (29/29)                        2018-07-25 03:11 (Local)
  Target:                     Ok        NGC 309 (ID: 213)
  Object Type:                Ok        Spiral Galaxy
 
  Checking Start Time ...     Ok        Wait till 03:23 to commence target (11.7 mins)
  Waiting till 03:23...
Observatory Alert                       2018-07-25 03:11 (Local)

Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
Session Suspended                       2018-07-25 03:11 (Local)
  Session: 2018-07-24         Info      Session suspended
  Close Shutter...            Ok        Shutter is closed (45s)
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...
  Open Shutter...             Ok        Shutter is open (45s)
Observatory Alert                       2018-07-25 03:13 (Local)
Critical Cloud Conditions:    Alert     Observatory Manager will close the Dome Shutter
Session Suspended                       2018-07-25 03:13 (Local)
  Session: 2018-07-24         Info      Session suspended
(..)
  Close Shutter...            Ok        Shutter is closing...
  Close Shutter...            Ok        Shutter is closed (45s)
  Checking Conditions...      Ok        Conditions have improved
  Observatory Manager:        Action    Opening Dome again
  Open Shutter...             
  Open Shutter...             Ok        Shutter is opening...
  Open Shutter...             Ok        Shutter is open (45s)

  Continue..

 [ lines removed for brevity ]      

  Checking position (2)
  Taking 15s image (C)...     Ok        [00615165] 02:24:10 (UT)  Full Locate C
  Linking image (UCA/USNO)... Failed    No Acceptable Match Found
  Linking image (GSC)...      Failed    No Acceptable Match Found
  Linking image (UCA/USNO*)...Failed    No Acceptable Match Found
  Linking image (GSC*)...     Failed    No Acceptable Match Found
 

Target Aborting ...           
Target Aborting ...           
Target Aborting ...           
Operation...                  Completed

With completion of Job Queue, the Session moved to 'Closing' and proceeded to close the dome, park the dome, park the telescope and disconnect the CCD camera (turning off temp regulation). (Note: several corrections need to be made to code to ensure closing of observatory equipment is fully completed before moving to the housekeeping stage).


Session Closing                         2018-07-25 03:25 (Local)
  Closing Session...
Closing Down Observatory                2018-07-25 03:25 (Local)
  Turnoff CCD cooling ...     Ok
  Turn off Dome Slaving...    Ok        Dome Slaving is OFF
Park Dome                               2018-07-25 03:25 (Local)
  Park Telescope ...          Ok        Parking Scope via POTH.Telescope command
  Disconnect Telescope ...    Ok
  Disconnect focuser ...      Ok
  Wait for CCD to re-warm ...
  Wait for CCD to re-warm ... Ok
  Disconnect Camera ...       Ok
(..)
  Close Shutter...            Ok        Shutter is closed (776s)
Park Dome...                  Ok        Dome is Parked
  Park Scope ..               
  Park Scope ..               Ok        Scope Is parked
 

The Session then moved to 'Housekeeping' and proceed to clean up raw files and move them to 'analysis/raw' folder, and to move log files to 'analysis/log' folder, before moving to 'Finished'.


Session Housekeeping                    2018-07-25 03:26 (Local)
  Finishing Session...        Info      2018-07-24
Cleanup FITS file names in ./New folder
  Preparing to clean-up file names
   88 fits files have been cleaned up
Create FITS summary file of ./New folder
  Preparing to transfer New files
   88 fits files have been examined in ./New folder
Transfer New Files to ./_Raw folder
  Preparing to transfer New files
  Copying .fits files ...
  Copying Fits Summary.dat
   88 fits files have been copied to the ./_RAW folder  (Total : 66.4 MB)
   0 images have been copied to the ./_RAW/_FOCUS folder (Total : 0.0 MB)

Operation...                  Completed