David's Astronomy Pages
Notes - Session 645 (2018-12-28)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 
Bullet Operational Issues
  - Critical Issues (1),  Major Issues (2),  Minor Issues (4),  Continuous Improvement (1)
  
Bullet Images from 2018-12-28  >>
 
 
 

Session Aims & Highlights (2018-12-28)

Main aims

  1. Targets. Acquire images for a selection of variable stars, nearby stars and deep sky targets
  2. Software. Test fixes & modifications made to the Observatory Control Program (CCDApp2) since the last session
  3. Stability. Continue checking stability of the Observatory System 

Equipment & Software

Highlights

Summary Plots & Logs

Observing Plan (2018-12-28, S645)
Image
 
Observing Result (2018-12-28, S645)
Image
   
Night Sky Summary Plot - 2018-12-28
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image
   
Time   Activity
Time    Event  Detail 
16:41 AstroMain Started AstroMain started (v3.6.1)
16:42 Services Started Observatory Services started
16:43   Dome Connected Pulsar Dome started
16:43   SBIG Camera Connected SBIG Camera connected (temp. set point -20 degC)
16:45   Telescope Connected Telescope connected (TheSky)
16:45 Session Initiated Session Initiated (Night Date 2018-12-28)
16:45   Plan Requested Observing Plan requested from AstroPlan Schedule Builder
16:47   Plan Loaded Observing Plan loaded (2018-12-28, V1, Start Time 17:11)
16:49 Session Started Session started (2018-12-28 S00645)
16:50 Session Equilibration Started Session Equilibration started
17:02 Shutter Opened Shutter Opened (45s)
17:03 Dome Port Changed Dome Port changed from COM14 to COM9
17:04 Dome Connected Pulsar Dome connected (COM9)
17:07 Dome Port Changed Dome Port changed from COM9 to COM14
17:09 Dome Connected Pulsar Dome connected (COM14)
17:13 Queue Started Queue started (2018-12-28 V1, 56 targets, Start Time 17:11)
17:50 Critical Cloud Alert Critical Cloud detected (Obs. Manager will close Dome Shutter)
17:51 Queue Aborted Queue aborted by user
17:51 Manual Mode Started Observatory Mode set to Manual
17:56 Automated Mode Started Observatory Mode set to Automated
17:56 Session Reinitiated Session reinitiated (2018-12-28)
17:56 Session Restarted Session restarted (2018-12-28 S00645)
17:56   Camera Reconnected SBIG Camerar reconnected (set point -20 degC)
17:56   Telescope Reconnected Telescope reconnected (TheSky6)
17:56 Queue Restarted Queue restarted (2018-12-28 V1, 56 targets, Start Time 17:11)
17:58   Dome Port Issue Unable to Close Shutter (Port is closed)
17:58 Conditions Improved Conditions Improved (session can be resumed)
17:58 Dome Port Issue Unable to Open Shutter (Port is closed)
17:58 Session Resumed Session Resumed
18:08 POTH stopped POTH services stopped
18:08 Dome Connected Pulsar Dome connected (COM14)
18:08 Poth.Telescope Connected LX200GPS/R connected (COM7)
18:11   Target Started (7/56) Target started (GCVS Z And)
18:17   Target Aborted (7/56) Target aborted (GCVS Z And)
18:17   Queue Aborted Queue aborted by user
18:17 Manual Mode Started Manual Mode started
18:23 Services Stopped Observatory Services stopped
18:41 Services Restarted Observatory Services restarted
18:48 Session Reinitiated Session Reinitriated (2018-12-28)
18:48 Camera Reconnected SBIG Camera reconnected (set point -25 degC)
18:48 Telescope Reconnected Telescope reconnected (TheSky6)
18:48 Session Restarted Session restarted (2018-12-28 S00645)
18:49 Queue Restarted Queue restarted (2018-12-28, V1)
19:18 Queue Aborted Queue aborted by User
19:18 Auto Mode Ended Auto Mode Ended
19:18 Manual Mode Started Observatory Mode to Manual
19:28 Automated Mode Automated Mode started
19:28   Camera reconnected SBIG Camera reconnected (set temp -25 degC)
19:28   Telescope reconnected Telescope reconnected (TheSky6)
19:28 Session Restarted Session Restarted (2018-12-28 S00645, 645092)
19:28 Queue Started Queue Started (2018-12-28, V2)
19:28     Target Started (1/53) Target started (1/53, GCVS HH And)
19:33     Target Completed (1/53) Target completed (1/53, GCVS HH And)
19:34 Critical Cloud Critical Cloud Detected (Obs.Manger will close the Dome)
19:35 Session Suspended Session suspended
19:35 Shutter Closed Shutter closed (49s)
20:48 Conditions Ok Conditions improved (session to be resumed)
20:49 Shutter Open Shutter open (45s)
20:49 Queue Resumed Queue Resumed
21:00     Target Started (8/53)     Target started (8/53, GCVS NV Ori)
21:07     Target Completed (8/53) Target completed (8/53, GCVS NV Ori)
21:12     Target Started (9/53) Target started (9/53, 46P/Wirtanen)
21:15     Target Aborted (9/53) Target aborted by Obs.Manger (Critical Cloud)
21:15 Critical Cloud Alert Critical Cloud Alert (Obs.Manger will close the Dome)
21:38 Queue Aborted Queue aborted by User
21:38 Observatory (Manual) Observatory placed in Manual Mode
21:38 Telescope Parked Telescope parked
21:39 Shutter Closed Shutter closed
21:40 Dome Parked Dome parked
21:41 Camera Disconnected SBIG Camera disconnected

Back to Top


Operational Issues (2018-12-28, S645)

[ Prev | Next ]

Critical Issues

Major Issues

Minor issues

Continuous Improvement

[ Prev | Next ]