David's Astronomy Pages
Notes - Session 646 (2018-12-29)

Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
 
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (1),  Minor Issues (3),  Continuous Improvement (1)  
 
Bullet Images from 2018-12-29  >>
 
 
 

Session Aims & Highlights (2018-12-29)

Main aims

  1. Targets. Acquire images of a range of targets (comets, variable stars, nearby stars and deep sky objects)
  2. Software. Test operation of Observatory Control Program (AstroMain)  following several recent code changes and corrections.
  3. Stability. Check overall stability of the Observatory System (hardware & software) 

Equipment & Software

Highlights

Summary Plots & Logs

Observing Plan (2018-12-29, S646)
Image
 
Observing Result (2018-12-29, S646)
Image
 
   
Night Sky Summary Plot - 2018-12-29
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image
  
Session Event Log (2018-12-29, S646)
Time   Event Detail
18:31 AstroMain Started AstroMain started
18:32 Services Started Observatory Services started
18:32   Dome Connected Pulsar Dome connected via POTH (COM9)
18:32   Telescope Connected LX200GPS/R connected via POTH
18:33 Observatory to Auto Observatory placed in Automated Mode
18:33 Session Initiated Session Initiated (2018-12-29)
18:33   Plan Requested Observing Plan requested from AstroPlan Scheduler
18:36   Plan Loaded Observing Plan loaded (2018-12-29, V1, Scheduled Start 18:41)
18:37 Equilbration Stated Equilibration Started
18:37   Camera1 Connected SBIG Camera connected(set temp -20 degC)
18:37   Telescope Connected Telescope Connected (TheSky)
18:37 Session Started Session started (2018-12-29 S00646)
18:58   Dome Unlocked Dome unlocked by User
18:59   Shutter Opened Shutter opened (opening time 45s)
19:19 Equilibration Started Dome equilibration started (wind direction 225 deg)
19:22 Equilibration Completed Dome equilibration completed (4 mins total)
19:23 Queue Started Queue started (2018-12-29 V1, 53 targets, Scheduled Start 18:41)
19:56 Queue Aborted Queue aborted by user
19:56 Observatory (Manual) Observatory placed on Manual Mode
20:02 Observatory (Auto) Observatory placed in Automated Mode
20:02 Preparing Session Preparing Session (2018-12-29)
20:02   Camera1 Connected SBIG Camera connected (set temp -20 degC)
20:02   Telescope Connected Telescope connected (TheSky6)
20:03 Session Restarted Session restarted (2018-12-29 S00646)
20:03 Equilibration Skipped Equilibration skipped by user
20:03 Queue Restarted Queue restarted (2018-12-29 V2, 53 targets, Scheduled Start 20:05)
20:03     Target Started (1/51) Target started (1/51, GCVS GK Per)
20:08     Target Completed (1/51) Target completed (1/51, GCVS GK Per)
20:08     Target Started (2/51) Target started (2/51, GCVS CI Cyg)
20:15     Target Completed (2/51) Target completed (2/51, GCVS CI Cyg)
20:16     Target Started (3/51) Target started (3/51, GCVS AM Her)
20:18 Critical Cloud Alert Critical Cloud Conditions (Obs.Manager will close Dome)
20:18     Target Aborted (3/51) Target aborted (3/51, GCVS AM Her), due to Cloud
20:18 Session Suspended Session suspended
20:19 Shutter Closed Shutter closed (closing time 50s)
20:31     Target Failed (4/51) Target failed (4/51), due to cloud
20:38     Target Failed (5/51) Target failed (5/51), due to cloud
20:48     Target Failed (6/51) Target failed (6/51), due to cloud
20:58     Target Failed (7/51) Target failed (7/51), due to cloud
21:08     Target Failed (8/51) Target failed (8/51), due to cloud
21:15     Target Failed (9/51) Target failed (9/51), due to cloud
21:17 Queue Aborted Queue aborted by user
21:17   Observatory (Manual) Observatory placed on Manual Mode
21:18   Session Closing Session closing (close down by user)
21:18   Telescope Parked Telescope parked
21:19   Dome Parked Dome parked
21:20   Camera1 Disconnected SBIG Camera closed down & disconnected
21:22   Services Stopped Observatory Services stopped
21:23   Session Ended Session ended

Back to Top


Operational Issues (2018-12-29, S646)

[ Prev | Next ]

Critical Issues

Major Issues

Minor issues

Continuous Improvement

[ Prev | Next ]

Back to Top