Notes - Session 655 (2019-02-01)

   
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
 
Bullet Operational Issues
  - Critical Issues (4),  Major Issues (5),  Minor Issues (5),  Continuous Improvement (2)
 
Bullet Investigation : Session Suspension Issue
 
Bullet Images from 2019-02-01  >>
 
Bullet Aurora Images/Video from 2019-02-01 >>
 

Session Aims & Highlights (2019-02-01)

Main aims

  1. Targets. Acquire images of a range of targets (comets, variable stars, nearby stars and deep sky objects) during a night of expected very good weather conditions
  2. Software. Test AstroMain 3.8.5 program to confirm recent fixes working and check for any newly introduced issues
  3. Stability. Continue confirmation of robust Observatory System (hardware & software combined)

Equipment & Software

Highlights

 Lowlights

Summary Plots & Logs

Observing Plan (2019-02-01, S655)
Image
 
Observing Result (2019-02-01, S655)
Image
 
   
Night Sky Summary Plot - 2019-02-01, S655
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image
  
Session Event Log (2019-02-01, S655)
Time     Event Detail
17:29:54 Session Created Live Session Created (2019-02-01 S00655, ImageSaveNum: 655001)
17:30:39   Obs.Manager Started Obs.Manager started
17:30:46   Services Started Observatory Services started
17:33:48   Telescope Connected Telescope Connected (TheSky6)
17:34:08   Camera1 Connected SBIG Camera Connected (set point -30°C)
17:35:15 Observatory (Auto) Observatory placed in Fully-Automated Mode
17:35:19 Session Pending Session pending (2019-02-01)
17:35:20   Plan Requested Observing Plan requested from AstroPlan ()
17:37:58 Observatory (Manual) Observatory placed in Manual Mode
17:41:08 Session Resumed Live Session Resumed (2019-02-01 S00655, ImageSaveNum: 655001)
17:41:42   Obs.Manager Started Obs.Manager started
17:42:04 Observatory (Auto) Observatory placed in Fully-Automated Mode
17:42:08 Session Pending Session pending (2019-02-01)
17:42:09   Plan Requested Observing Plan requested from AstroPlan ()
17:45:34   Plan Loaded Observing Plan loaded to queue (2019-02-01 V1 BEST PLAN, Plan ID: 262)
17:45:50   Camera1 Connected SBIG Camera Connected (set point -30°C)
17:45:53   Telescope Connected Telescope Connected (TheSky6)
17:51:55 Observatory (Manual) Observatory placed in Manual Mode
17:52:17 Observatory (Auto) Observatory placed in Fully-Automated Mode
17:52:18 Session Pending Session pending (2019-02-01)
17:52:19   Plan Loaded Observing Plan loaded to queue (2019-02-01 V1 BEST PLAN, Plan ID: 262)
17:52:22   Camera1 Connected SBIG Camera Connected (set point -30°C)
17:52:24   Telescope Connected Telescope Connected (TheSky6)
17:55:25 Session Resumed Live Session Resumed (2019-02-01 S00655, ImageSaveNum: 655001)
17:55:35   Obs.Manager Started Obs.Manager started
17:55:54   Camera1 Connected SBIG Camera Connected (set point -30°C)
17:56:00   Telescope Connected Telescope Connected (TheSky6)
17:56:18 Observatory (Auto) Observatory placed in Fully-Automated Mode
17:56:22 Session Pending Session pending (2019-02-01)
17:56:23   Plan Loaded Observing Plan loaded to queue (2019-02-01 V1 BEST PLAN, Plan ID: 262)
17:56:25   Camera1 Connected SBIG Camera Connected (set point -30°C)
17:56:27   Telescope Connected Telescope Connected (TheSky6)
17:57:16   Shutter Opened Shutter opened (opening time 45s)
17:57:17   Equilibration Started Dome Equilibration started
18:02:21   Equilibration Ended Dome Equilibration ended (5.1 mins total)
18:02:22   Queue Started Observing Queue started (39 targets selected)
18:02:23     Target Started (1/39) Target started (1/39, GCVS EV Lac)
18:08:11     Target Completed Target completed (1/39, GCVS EV Lac)
18:11:26       Focusing Started (Foc1) Foc1 Focusing Started (TCF-S)
18:14:48       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
18:20:06     Target Completed Target partially completed (2/39, GCVS Z And)
18:26:15     Target Completed Target completed (3/39, GCVS HH And)
18:32:26     Target Completed Target completed (4/39, WDS GRB 34)
18:32:27     Target Started (5/39) Target started (5/39, GCVS U And)
18:45:43     Target Completed Target completed (5/39, GCVS U And)
18:54:27     Target Completed Target completed (6/39, GCVS DY Per)
19:11:54     Target Completed Target partially completed (7/39, GCVS GK Per)
19:20:59     Target Completed Target completed (9/39, GCVS DX Cnc)
19:24:13       Focusing Started (Foc1) Foc1 Focusing Started (TCF-S)
19:27:58       Focusing Completed Foc1 AutoFocus Completed (Profile No 2)
19:41:43     Target Completed Target partially completed (10/39, 46P/Wirtanen)
20:04:45 Session Resumed Live Session Resumed (2019-02-01 S00655, ImageSaveNum: 655117)
20:05:15   Obs.Manager Started Obs.Manager started
20:05:36   Services Started Observatory Services started
20:05:59   Services Stopped Observatory Services stopped
20:06:07   Obs.Manager Started Obs.Manager started
20:06:14   Services Started Observatory Services started
20:06:38 Observatory (Auto) Observatory placed in Fully-Automated Mode
20:06:39 Session Pending Session pending (2019-02-01)
20:06:40 Session Initiating Session initiating (2019-02-01)
20:06:41   Plan Loaded Observing Plan loaded to queue (2019-02-01 V1 BEST PLAN, Plan ID: 262)
20:06:53   Camera1 Connected SBIG Camera Connected (set point -30°C)
20:06:56   Telescope Connected Telescope Connected (TheSky6)
20:07:47   Shutter Opened Shutter opened (opening time 46s)
20:07:48   Equilibration Started Dome Equilibration started
20:07:49   Queue Started Observing Queue started (28 targets selected)
20:07:50     Target Started (12/39) Target started (12/39, NGC 201)
20:18:51     Target Completed Target partially completed (12/39, NGC 201)
20:38:19     Target Completed Target completed (13/39, NGC 936)
20:54:13     Target Completed Target completed (14/39, NGC 1084)
20:57:53       Focusing Started (Foc1) Foc1 Focusing Started (TCF-S)
21:01:07       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
21:15:38     Target Completed Target completed (15/39, NGC 1999)
21:23:09   Dome Port Changed Dome Port changed from COM9 to COM14
21:23:36     Target Completed Target completed (16/39, GCVS FO Ori)
21:27:40       Focusing Started (Foc1) Foc1 Focusing Started (TCF-S)
21:32:16       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
21:34:37     Target Completed Target partially completed (17/39, GCVS RR Tau)
21:44:08     Target Completed Target completed (18/39, GSC 1224:29)
21:52:07     Target Completed Target partially completed (19/39, GCVS NV Ori)
22:02:30     Target Completed Target partially completed (20/39, GCVS U Mon)
22:02:31     Target Started (21/39) Target started (21/39, GCVS SY Cnc)
22:09:17     Target Completed Target completed (21/39, GCVS SY Cnc)
22:09:18     Target Started (22/39) Target started (22/39, GCVS FU Ori)
22:12:25       Focusing Started (Foc1) Foc1 Focusing Started (TCF-S)
22:15:54       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
22:19:06     Target Completed Target partially completed (22/39, GCVS FU Ori)
22:27:37     Target Completed Target completed (23/39, GCVS U Gem)
22:37:59     Target Completed Target partially completed (24/39, GCVS RZ LMi)
22:38:00     Target Started (25/39) Target started (25/39, GCVS AM CVn)
22:47:04     Target Completed Target completed (25/39, GCVS AM CVn)
22:53:52     Target Completed Target completed (26/39, LAMOST-HVS1)
23:04:56     Target Completed Target completed (27/39, GCVS CN Leo)
23:17:49     Target Completed Target completed (28/39, NGC 1907)
23:28:33     Target Completed Target completed (29/39, GCVS SU Tau)
23:36:43     Target Completed Target completed (30/39, GCVS CN Ori)
23:36:44     Target Started (31/39) Target started (31/39, NGC 2628)
23:56:47     Target Completed Target completed (31/39, NGC 2628)
00:03:32     Target Completed Target completed (32/39, GCVS ER UMa)
00:06:03     Target Started (33/39) Target started (33/39, 38P/Stephan-Oterma)
00:16:56     Target Completed Target completed (33/39, 38P/Stephan-Oterma)
00:27:44     Target Completed Target completed (34/39, C/2015 O1 (PANSTARRS))
00:28:01     Target Started (35/39) Target started (35/39, NGC 1528)
00:41:15     Target Completed Target completed (35/39, NGC 1528)
01:00:36     Target Completed Target partially completed (36/39, IC 983)
01:00:37 User Interventation User Interventation in order to close session
01:00:50 Session Closing Session Closing (Manual)
01:01:49   Shutter Closed Shutter closed (closing time 63,684,666,109s)
01:03:21   Camera1 Disconnected SBIG Camera closed down & disconnected
01:03:51   Services Stopped Observatory Services stopped
01:03:58 Program Closed Program closed by User
01:04:00 Session Finished Session Finished (Manual)

Back to Top


Operational Issues (2019-02-01, S655)

[ Prev | Next ]

Critical Issues

Major Issues

Minor issues

Continuous Improvement

[ Prev | Next ]

Back to Top


Investigation : Session Suspension Issue

Session not correctly suspended when dome shutter closed during Interval of Cloud

Critical. Computer may have unexpectedly restarted (2019-02-01 20:02:24)
Action. The Observatory Dome will be checked and made safe
Action. ASCOM Dome (COM9)
Ok. Retrieving Profile for ASCOM.Pulsar_Observatories_Dome.Dome
Ok. Setting COM Port To COM9
Ok. Saving Profile for ASCOM.Pulsar_Observatories_Dome.Dome
Ok. Started (POTH->Pulsar Observatories Dome)
Critical. Shutter is open
Action. Shutter will be closed
Ok. Shutter has been successfully closed (Close Time: 47s)
Critical. Dome is not Parked
Action. Parking Dome...
Ok. Stopping ASCOM.Dome
Ok. Closing Program (2019-02-01 20:04:41)

 