David's Astronomy Pages
Notes - Session 1124 (2023-07-30)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
Bullet Operational Issues
  - Critical Issues (0),  Major Issues (1),  Minor Issues (0),  Small Defects (0),  Continuous Improvement (0)
 
Bullet Images from 2023-07-30 >>         
   

Session Aims & Highlights (2023-07-30)

Main aims

  1. Dome Slews.  Check dome slewing for a successful fix to the issue in S1123 session whereby dome slews weren't going to correct azimuths. Fix involved a recalibration of the Pulsar Dome Rotation system on 2023-07-22.
  2. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions

 Equipment & Software

Highlights

Notes:

Summary Plots & Logs

Observing Plan
All targets were recorded as either completed , however images from first 7 targets were later rejected.as they were significantly out of foucs.
Scope was automatically focused ahead of V Sge and the last 5 targets were accepted.
Image
  
Observing Result
Image
 
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
 
  
Sky Conditions (Locate Frames)
Image 
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
  
Session Event Log
Time     Event Detail
22:28:41 Session Monitoring AutoStart monitoring for Live Session opportunity between 22:40 & 02:39
22:28:44   AutoStart Waiting AutoStart waiting till earliest start time at 22:40
22:40:50   AutoStart Delayed Session delayed due to too few stars
23:27:15 Session AutoStarting Session autostarting (23:27)
23:27:44   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
23:27:57 Session Created Session Created (Live, 2023-07-30 S01124, ImageSaveNum: 1124001)
23:28:24   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
23:30:03   Services Started Observatory Services started
23:30:10 Observatory (Auto) Observatory placed in Fully-Automated Mode
23:30:12 Session Pending Session pending (2023-07-30)
23:30:14 Session Initiating Session initiating (2023-07-30)
23:30:16   Plan Requested Observing Plan requested from AstroPlan (1.38.1)
23:30:53   Plan Loaded Observing Plan loaded to queue (Plan ID: 897)
23:31:15   Camera1 Connected SBIG Camera connected (set point -10°C)
23:31:52   Telescope Connected Telescope connected (TheSky6)
23:32:16 Session Equilibration Session ready to Open Dome
23:33:01   Dome Opened Dome opened (opening time 45s)
23:33:16 Session Running Session running
23:33:19   Queue Started Observing Queue started (12 targets selected)
23:33:22     Target Started (NrZen) Target started (Focus Field 19, HIP 93376)
23:33:35       Dome Unparked Dome unparked
23:38:48       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
23:41:09       Focusing Failed Foc1 focusing failed (failed QC check - Range)
23:41:11       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
23:43:06       Focusing Completed Foc2 AutoFocus Completed (Profile No 1, wide)
23:44:48       Focusing Completed Foc2 AutoFocus Completed (Profile No 1)
23:45:05     Target Completed (NrZen) Target completed (Focus Field 19, HIP 93376)
23:46:42     Target Started (1/12) Target started (1/12, M101 w/SN2023ixf)
23:52:19       Focusing Skipped Foc1 focusing skipped - unable to find a star (TCF-S)
23:59:42   SBIG Camera Take Image failed (Command timed-out)
23:59:45   CCDSoft Restarting CCDSoft being restarted (attempt to fix locked thread)
23:59:50   SBIG Camera Reset SBIG Camera being power-cycled
00:00:32   Camera1 Connected SBIG Camera connected (set point -10°C)
00:01:01   SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
00:10:36     Target Completed Target completed (1/12, M101 w/SN2023ixf)
00:10:40     Target Started (2/12) Target started (2/12, NGC 5297 w/AT2023mlt)
00:15:24       Focusing Skipped Foc1 focusing skipped - star is lost (TCF-S)
00:32:35     Target Completed Target completed (2/12, NGC 5297 w/AT2023mlt)
00:32:39     Target Started (3/12) Target started (3/12, UGC 9350 w/SN2023nny)
00:37:29       Focusing Skipped Foc1 focusing skipped - star is lost (TCF-S)
00:54:26     Target Completed Target completed (3/12, UGC 9350 w/SN2023nny)
00:54:30     Target Started (4/12) Target started (4/12, C/2019 T4 (ATLAS))
00:57:51       Focusing Skipped Foc1 focusing skipped - star is lost (TCF-S)
01:06:06     Target Completed Target completed (4/12, C/2019 T4 (ATLAS))
01:07:14     Target Started (5/12) Target started (5/12, HIP 87937)
01:08:36     Dome Slew Dome slew held up at Az. 248.2° (Delay 43s)
01:11:09       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-S)
01:13:42     Target Completed Target completed (5/12, HIP 87937)
01:15:37     Target Started (6/12) Target started (6/12, AT2023cvz (CV))
01:18:32       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-S)
01:24:26     Target Completed Target completed (6/12, AT2023cvz (CV))
01:27:37     Target Started (7/12) Target started (7/12, AT2023cur)
01:30:01       Focusing Skipped Foc1 focusing skipped - star is too dim (TCF-S)
01:46:26     Target Completed Target completed (7/12, AT2023cur)
01:49:37     Target Started (8/12) Target started (8/12, GCVS V Sge)
01:53:08       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:56:00       Focusing Completed Foc1 AutoFocus Completed (Profile No 2, wide)
01:58:29       Focusing Completed Foc1 AutoFocus Completed (Profile No 2)
02:06:26     Target Completed Target completed (8/12, GCVS V Sge)
02:06:30     Target Started (9/12) Target started (9/12, GCVS BL Lac)
02:10:39     Dome Slew Dome slew held up at Az. 162.0, 163.1° (Total delay 205s)
02:17:00     Target Completed Target completed (9/12, GCVS BL Lac)
02:17:04     Target Started (10/12) Target started (10/12, GCVS Z And)
02:20:06       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:22:10       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
02:27:03     Target Completed Target completed (10/12, GCVS Z And)
02:27:07     Target Started (11/12) Target started (11/12, NGC 513 w/AT2023jpp)
02:30:01       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:32:11       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
02:48:13     Target Completed Target completed (11/12, NGC 513 w/AT2023jpp)
02:48:35     Target Started (12/12) Target started (12/12, M33 w/AT2023nou)
02:51:24       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:53:40       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
03:09:37     Target Completed Target completed (12/12, M33 w/AT2023nou)
03:09:40   Queue Completed Job Queue completed
03:09:42 Session Closing Session closing
03:10:32   Dome Closed Dome closed (closing time 45s)
03:11:00   Dome Parked Dome parked (parking time 20s), Az: 90.1 deg
03:12:15   Telescope Parked Telescope parked (parking time 71s)
03:12:30   Telescope State Handbox reads 'Scope parked Turn scope off.'
03:12:52   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
03:14:14   Services Stopped Night Services stopped
03:14:17 Session Housekeeping Session Housekeeping started (Create Fits Summary, Transfer Files)
03:14:32 Session Finished Session Finished
 
Session Alerts & Alarms
Time     Type       Name Detail
23:59:42 Red Alert SBIG Camera Alert Take Image failed (Command timed-out)
00:01:01 Green Clear SBIG Camera Take Image command accepted (bSbigDriverException flag is reset)
01:08:36 Yellow Alert Dome Slew Dome slew held up at Az. 248.2° (Delay 43s)
02:08:35 Yellow Alert Anomalous Dome Slew Dome slew resumed at Az 162.0° (T+119.7s)
02:10:32 Yellow Alert Anomalous Dome Slew Dome slew resumed at Az 163.7° (T+236.9s)
02:10:39 Red Alert Dome Slew Dome slew held up at Az. 162.0, 163.1° (Total delay 205s)
02:10:43 Yellow Alert Dome Discrepency Difference between Dome Az and Slave Az is > 1 deg (GCVS BL Lac)
 