Session Aims & Highlights (2024-09-16)

Main aims

  1. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions.
  2. AstroMain.  Check new 3.69.8 version of AstroMain to ensure new code in ObsManager for handling JobQueue/TheSky6 freezes has no negative effects or problems
  3. ImageLink/TheSky6.  Monitor session for any further incidents of the issue where the ImageLink process freezes for 5 minutes leading to Target Abort & Session Suspension.  Tracing was further extended in AstroMain 3.69.8. The new version also contains some statements tha might potentially resolve the ongoing issue.

 Equipment & Software

Highlights-

Notes:

Summary Plots & Logs

Observing Plan
Image
  
Observing Result
Image
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
  
Sky Conditions (Locate Frames)
Image 
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
  
Session Event Log
Time     Event Detail
20:40:31 Session Monitoring AutoStart monitoring for Live Session opportunity between 20:40 & 04:37
20:40:36 Session AutoStarting Session autostarting (20:40)
20:40:58   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
20:41:26   Camera1 Connected SBIG Camera connected (Set point -20°C)
20:41:29 Session Created Session Created (Live, 2024-09-16 S01245, ImageSaveNum: 1245001)
20:41:34   Scope Switched On Telescope Power has been switched on via UPB Powerbox.
20:43:35   Services Started Observatory Services started
20:43:42 Observatory (Auto) Observatory placed in Fully-Automated Mode
20:43:46 Session Pending Session pending (2024-09-16)
20:43:48 Session Initiating Session initiating (2024-09-16)
20:43:57   Camera1 Connected SBIG Camera connected (Set point -10°C)
20:44:04   Plan Requested Observing Plan requested from AstroPlan (1.40.9)
20:44:55   Plan Loaded Observing Plan loaded to queue (Plan ID: 1020)
20:45:36   Telescope Connected Telescope connected (TheSky6)
20:46:00 Session Equilibration Session ready to Open Dome
20:46:45   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
20:47:05 Session Running Session running
20:47:08   Queue Started Observing Queue started (30 targets selected)
20:47:11     Target Started (NrZen) Target started (Focus Field 19, HIP 93376)
20:47:26       Dome Unparked Dome unparked
20:50:31       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
20:52:57       Focusing Completed Foc1 AutoFocus Completed (Profile No 1, wide)
20:55:12       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
20:55:14       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
20:57:06       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
20:58:48       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
20:59:05     Target Completed (NrZen) Target completed (Focus Field 19, HIP 93376)
21:00:32     Target Started (1/30) Target started (1/30, IC 1125 w/SN2024jz)
21:02:27       SoftSuspend Called Soft Suspend called due to Deteriorating Conditions (too few stars)
21:05:57     Target Failed (1/30) Target failed due to cloud (1/30, IC 1125 w/SN2024jz)
21:05:59   Queue Paused Queue paused for Session Suspension
21:06:01 Session Suspending Session suspending
21:06:47   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
21:06:49 Session Suspended Session suspended
21:19:28     Target Cancelled Target cancelled (1/30, IC 1125 w/SN2024jz) due to cloud
21:41:48     Target Cancelled Target cancelled (2/30, LEDA 1846725 w/SN2024iss) due to cloud
21:55:48     Target Cancelled Target cancelled (3/30, AT2024re (CV)) due to cloud
22:08:08     Target Cancelled Target cancelled (4/30, AT2022aeet (CV)) due to cloud
22:20:28     Target Cancelled Target cancelled (5/30, AT2022fkp (CV)) due to cloud
22:31:42     Target Cancelled Target cancelled (6/30, GCVS Z And) due to cloud
22:42:57     Target Cancelled Target cancelled (7/30, AT2023eu (CV)) due to cloud
22:53:15     Target Cancelled Target cancelled (8/30, GCVS CY Lyr) due to cloud
23:13:15     Target Cancelled Target cancelled (9/30, AT2023cuj) due to cloud
23:27:51     Target Cancelled Target cancelled (10/30, GCVS T CrB) due to cloud
23:47:12     Target Cancelled Target cancelled (11/30, AT2023ygv) due to cloud
23:59:31     Target Cancelled Target cancelled (12/30, Nova Vul 2024) due to cloud
00:09:19     Target Cancelled Target cancelled (13/30, KIC 8462852) due to cloud
00:21:39     Target Cancelled Target cancelled (14/30, AT2021aesn (CV)) due to cloud
00:41:59     Target Cancelled Target cancelled (15/30, CGCG 478-048 w/SN2022xzm) due to cloud
01:03:59     Target Cancelled Target cancelled (16/30, AT2024ges) due to cloud
01:26:19     Target Cancelled Target cancelled (17/30, AT2024vhz) due to cloud
01:40:19     Target Cancelled Target cancelled (18/30, AT2023abtp (CV)) due to cloud
01:52:19     Target Cancelled Target cancelled (19/30, AT2024epi (CV)) due to cloud
02:12:19     Target Cancelled Target cancelled (20/30, M31 w/AT2024dya) due to cloud
02:28:23 Session Resuming Session resuming
02:29:08   Dome Opened Dome opened (Opening time 45s, Zigbee 40s)
02:29:11 Session Running Session running
02:29:13   Queue Resumed Observing Queue resumed
02:29:15     Target Started (21/30) Target started (21/30, AT2024ugc)
02:32:53       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
02:35:04       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
02:41:49     Target Completed Target partially completed (21/30, AT2024ugc)
02:41:53     Target Started (22/30) Target started (22/30, NGC 3206 w/SN2024bch)
03:03:48     Target Completed Target completed (22/30, NGC 3206 w/SN2024bch)
03:03:52     Target Started (23/30) Target started (23/30, GCVS BL Lac)
03:07:30       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
03:09:31       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
03:13:24     Target Completed Target completed (23/30, GCVS BL Lac)
03:13:28     Target Started (24/30) Target started (24/30, AT2024uue (CV))
03:16:40       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
03:19:08       Focusing Completed Foc1 AutoFocus Completed (Profile No 5)
03:25:01     Target Completed Target completed (24/30, AT2024uue (CV))
03:25:05     Target Started (25/30) Target started (25/30, GCVS U And)
03:27:59       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
03:30:12       Focusing Completed Foc1 AutoFocus Completed (Profile No 6)
03:40:53     Target Completed Target completed (25/30, GCVS U And)
03:40:58     Target Started (26/30) Target started (26/30, UGC 2028 w/SN2022xkt)
03:44:07       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
03:46:36       Focusing Completed Foc1 AutoFocus Completed (Profile No 7)
04:03:04     Target Completed Target completed (26/30, UGC 2028 w/SN2022xkt)
04:03:08     Target Started (27/30) Target started (27/30, AT2023sqo (CV))
04:14:50     Target Completed Target completed (27/30, AT2023sqo (CV))
04:14:54     Target Started (28/30) Target started (28/30, LEDA 16241 w/SN2024qiw)
04:18:00       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
04:20:30       Focusing Completed Foc1 AutoFocus Completed (Profile No 8)
04:36:41     Target Completed Target completed (28/30, LEDA 16241 w/SN2024qiw)
04:36:45     Target Started (29/30) Target started (29/30, AT2024eja)
04:39:51       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
04:42:49       Focusing Completed Foc1 AutoFocus Completed (Profile No 9)
04:59:05     Target Completed Target completed (29/30, AT2024eja)
04:59:09     Target Started (30/30) Target started (30/30, AT2024vid)
05:02:49       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
05:05:22       Focusing Completed Foc1 AutoFocus Completed (Profile No 10)
05:19:53     Target Completed Target completed (30/30, AT2024vid)
05:19:55   Queue Completed Job Queue completed
05:19:59 Session Closing Session closing
05:20:54   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
05:22:15   Dome Parked Dome parked (parking time 73s), Az: 90.1 deg
05:23:28   Telescope Parked Telescope parked (parking time 67s total)
05:23:43   Telescope State Handbox reads 'Scope parked Turn scope off.'
05:24:06   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
05:25:32   Services Stopped Night Services stopped
05:25:35 Session Finishing Session Finishing started (Create Fits Summary, Transfer Files)
05:25:47     Dome (Find Park) Find Park started (Search Az 80.0 to 100.0°, Step 1.0°, Wide)
05:26:52     Dome Find Park found (Best Park Az 91.5°)
05:26:59     Dome (Find Park) Find Park started (Search Az 89.6 to 93.6°, Step 0.2°, Narrow)
05:27:51     Dome Find Park found (Best Park Az 91.4°)
05:27:57     Dome Dome has been synced at park position (Az 90.0°, Adjustment: -1.5°)
05:27:59   Dome Parked Dome parked
05:30:00   Dome Charging Dome is parked and re-charging Ok (29mA)
05:30:02 Session Finished Session Finished

 
Session Alerts & Alarms
Time     Type       Name Detail
03:05:00 Yellow Alert Dome Discrepency Difference between Dome Az and Slave Az is > 1 deg (GCVS BL Lac)
05:30:00 Green Clear Dome Charging Dome is parked and re-charging Ok (29mA)
 

Back to Top


Operational Issues (2024-09-16 S1245)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement

[ Prev | Next ]

Back to Top


Replacement Temperature/Humidity Sensor (Greenhouse2)

A replacement Aqara Temperature/Humidity Multi-Sensor has been added to the Observatory's ZigBee Network today (2024-09-16) using Phoscon App. 

This is a new sensor to replace the original 'Greenhouse2' multisensor (installed 2023-10-10) which is no-longer reachable, despite a number of attempts to re-pair it with the Zigbee Network (see  Issue - Greenhouse Temp/Humidity Sensor 2 are not reading/communicating fresh T/H data (2024-09-07) and Defect - Greenhouse Temp/Humidity Sensor 2 is unreachable (2024-08-20).

After deleting the old Greenhouse2 sensor the following new sensor ids are listed in the sensor list as :

   23: Greenhouse2, ZHAHumidity, humidity
  24: Greenhouse2, ZHATemperature, temperature
  25: Greenhouse2, ZHAPressure, pressure

These 3 sensors replace the orginal Greenhouse2 sensors (id's 13, 14, 15)

The replacement sensor has initially been located outside next to the Weather Station's Outdoor T/H sensor as this is an opportunity to check the T/H values coming from the Weather Station's outdoor sensor which been recently questioned.  At a later date the replacement Greenhouse2 sensor will be finally placed in the Greenhouse in lieu of the orginal Greenhouse2 sensor.

After installing the new sensor the Phoscon/deConz setting were backed up to the file "raspbee_gateway_config_2024-09-16.dat".

Actions

Back to Top