David's Astronomy Pages
Notes - Session 1332 (2025-06-03)

 
Bullet Session Aims & Highlights
 - Observing Result
 - Night Summary Plot
 - Session Event Log
Bullet Operational Issues
- Critical Issues (0),  Major Issues (0),  Minor Issues (0),  Small Defects (1),  Continuous Improvement (3)
- Figures (1)
   
Bullet Images from 2025-06-03  >>           
   
Bullet Current/Latest Session >>
   

Session Aims & Highlights (2025-06-03)

Main aims

  1. Targets.  Acquire images of a selection of variable stars, nearby stars, comets & deep sky targets as allowed by sky conditions.

 Equipment & Software

Highlights

Notes

Summary Plots & Logs

Observing Plan
Plan not created for this session

Image
  
Observing Result
Image
   
Image
 
Dome & Scope Slewing Performance
Image
  
Slew/Centering Performance
Image
  
Guiding Performance
Image
  
Sky Conditions (Locate Frames)
Image 
  
Night Sky Summary Plot
Top axis: Sky Brightness at Zenith (in ADU/s)
Lefthand axis: Local Time (hh LT). Righthand axis: Sun Altitude (degs)
Note:  The NorthCam Star Count line is unreliable and should be ignored
(The AstroNorthCam 'Find' Star method is producing many false positives from clouds)
Image   
  
Actual Weather vs Pre-Session Weather Forecast
Image
Image
 
Session Event Log
Time     Event Detail
00:05:34 Session Monitoring AutoStart monitoring for Live Session opportunity between 00:05 & 00:55
00:05:36   AutoStart Waiting AutoStart waiting till earliest start time at 00:05
00:05:46 Session AutoStarting Session autostarting (00:05)
00:06:07   CCDSoft Restarting CCDSoft being restarted (to set AutoSave No.)
00:06:35   Camera1 Connected SBIG Camera connected (Set point -15°C)
00:06:37 Session Created Session Created (Live, 2025-06-03 S01332, ImageSaveNum: 1332001)
00:06:42   Scope Switched On Telescope Power has been switched on via UPB Switch
00:08:33   Services Started Observatory Services started
00:08:40 Observatory (Auto) Observatory placed in Fully-Automated Mode
00:08:42 Session Pending Session pending (2025-06-03)
00:08:44 Session Initiating Session initiating (2025-06-03)
00:08:54   Camera1 Connected SBIG Camera connected (Set point -15°C)
00:09:00   Plan Requested Observing Plan requested from AstroPlan (1.43.11)
00:10:25   Plan Loaded Observing Plan loaded to queue (Plan ID: 1117)
00:11:07   Telescope Connected Telescope connected (TheSky6)
00:11:32 Session Equilibration Session ready to Open Dome
00:12:17   Dome Opened Dome opened (Opening time 45s, Zigbee 41s)
00:12:19   Equilibration Started Dome Equilibration started
00:17:03   Equilibration Ended Dome Equilibration ended (4.8 mins total)
00:17:05 Session Running Session running
00:17:08   Queue Started Observing Queue started (7 targets selected)
00:17:10     Target Started (NrZen) Target started (Focus Field 14, HIP 69068)
00:17:24       Dome Unparked Dome unparked
00:21:53       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:24:42       Focusing Completed Foc1 AutoFocus Completed (Profile No 1, wide)
00:27:05       Focusing Completed Foc1 AutoFocus Completed (Profile No 1)
00:27:07       Focusing Started-Foc2 Foc2 Focusing Started (Secondary Scope, using ShCap)
00:29:08       Focusing Completed Foc2 AutoFocus Completed (Profile No 2, wide)
00:30:49       Focusing Completed Foc2 AutoFocus Completed (Profile No 2)
00:31:06     Target Completed (NrZen) Target completed (Focus Field 14, HIP 69068)
00:31:10     Target Started (1/7) Target started (1/7, GCVS BL Lac)
00:36:14       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
00:38:48       Focusing Completed Foc1 AutoFocus Completed (Profile No 3)
00:43:21     Target Completed Target completed (1/7, GCVS BL Lac)
00:43:26     Target Started (2/7) Target started (2/7, AT2025kej (CV))
00:45:06   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
00:45:08   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
00:45:10     Target Aborted (2/7) Target aborted (2/7, AT2025kej (CV)) due to cloud
00:45:12   Queue Paused Queue paused for Session Suspension
00:45:14 Session Suspending Session suspending
00:46:02   Dome Closed Dome closed (Closing time 50s, Zigbee 44s)
00:46:05 Session Suspended Session suspended
00:54:02     Target Cancelled Target cancelled (2/7, AT2025kej (CV)) due to cloud
01:14:32     Target Cancelled Target cancelled (3/7, NGC 6685 w/SN2023ndu) due to cloud
01:26:50     Target Cancelled Target cancelled (4/7, KIC 8462852) due to cloud
01:32:07 Session Resuming Session resuming
01:32:52   Dome Opened Dome opened (Opening time 45s, Zigbee 41s)
01:32:55 Session Running Session running
01:32:57   Queue Resumed Observing Queue resumed
01:32:59     Target Started (5/7) Target started (5/7, 61 Cyg)
01:37:12     Target Completed Target completed (5/7, 61 Cyg)
01:37:16     Target Started (6/7) Target started (6/7, GCVS CI Cyg)
01:41:12       Focusing Started-Foc1 Foc1 Focusing Started (TCF-S)
01:43:49       Focusing Completed Foc1 AutoFocus Completed (Profile No 4)
01:45:13   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
01:45:15   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
01:45:18     Target Aborted (6/7) Target aborted (6/7, GCVS CI Cyg) due to cloud
01:45:20   Queue Paused Queue paused for Session Suspension
01:45:22 Session Suspending Session suspending
01:46:08   Dome Closed Dome closed (Closing time 50s, Zigbee 44s)
01:46:11 Session Suspended Session suspended
01:56:45 Session Resuming Session resuming
01:56:55   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
01:56:57   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
01:56:59     Target Aborted (7/7) Target aborted (7/7, AT2024hr (CV)) due to cloud
01:57:01   Queue Paused Queue paused for Session Suspension
01:57:30   Dome Opened Dome opened (Opening time 45s, Zigbee 41s)
01:57:32 Session Running Session running
01:57:34   Queue Resumed Observing Queue resumed
01:57:37     Target Started (7/7) Target started (7/7, AT2024hr (CV))
01:59:45   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
01:59:47   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
01:59:49     Target Aborted (7/7) Target aborted (7/7, AT2024hr (CV)) due to cloud
01:59:51   Queue Paused Queue paused for Session Suspension
01:59:53 Session Suspending Session suspending
02:00:40   Dome Closed Dome closed (Closing time 50s, Zigbee 44s)
02:00:43 Session Suspended Session suspended
02:02:45 Session Resuming Session resuming
02:03:31   Dome Opened Dome opened (Opening time 45s, Zigbee 41s)
02:03:33 Session Running Session running
02:03:35   Queue Resumed Observing Queue resumed
02:03:36     Target Started (7/7) Target started (7/7, AT2024hr (CV))
02:09:41   Critical Cloud Alert Critical Cloud Alert (Obs.Manager will close the Dome)
02:09:43   HardSuspend Called Hard Suspend called due to Critical Conditions (cloud)
02:09:45     Target Aborted (7/7) Target aborted (7/7, AT2024hr (CV)) due to cloud
02:09:47   Queue Paused Queue paused for Session Suspension
02:09:49 Session Suspending Session suspending
02:10:36   Dome Closed Dome closed (Closing time 50s, Zigbee 43s)
02:10:39 Session Suspended Session suspended
02:11:07   Queue Completed Job Queue completed
02:11:11 Session Closing Session closing
02:11:16   Dome Closed Dome already closed (closed at 02:10, closing time 50s, zigbee 43s)
02:11:45   Dome Parked Dome parked (parking time 20s), Az: 90.0 deg
02:12:27   Telescope Parked Telescope parked (parking time 39s total)
02:12:51   Telescope State Handbox reads 'Scope parked Turn scope off.'
02:13:13   Telescope Switched Off Telescope Power has been switched off via UPB Switch.
02:14:39   Services Stopped Night Services stopped
02:14:41 Session Finishing Session Finishing started (Create Fits Summary, Transfer Files)
02:14:49     Dome (Find Park) Find Park started (Search Az 80.0 to 100.0°, Step 1.0°, Wide)
02:15:09     Dome Find Park found (Best Park Az 80.5°)
02:15:15     Dome (Find Park) Find Park started (Search Az 78.4 to 82.4°, Step 0.2°, Narrow)
02:15:57     Dome Find Park found (Best Park Az 80.6°)
02:16:03     Dome Dome has been synced at park position (Az 90.0°, Adjustment: +9.4°)
02:16:05   Dome Parked Dome parked
02:17:32   Dome Charging Dome is parked and re-charging Ok (20mA)
02:17:34 Session Finished Session Finished
 
Session Alerts & Alarms
Time     Type       Name Detail
00:08:42 Yellow Alert Disk Space Free Space on C:\ Drive (49.51 GB) is less than 50 GB
02:17:32 Green Clear Dome Charging Dome is parked and re-charging Ok (20mA)
 

Back to Top


Operational Issues (2025-06-03, S1332)

[ Prev | Next ]

Critical Issues

Major Issues

Minor Issues

Small Defects

Continuous Improvement

[ Prev | Next ]


Fig 1.  New Difference Chart showing 'Clair-roe' differences for X, Y, Z on a single chart (AstroMag 1.4.23, 2025-06-04)

The calculated average difference error (e.g. 34.8, 104,3, 113.4 in this example) will be used as the Objective Function result for a new GA tool (to be developed) for understanding and setting best parameters used for temperature correction.

Image

[ Prev | Next ]

Back to Top